My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 9 <br />During the Council budget workshops in April and May 2023, in addition to information on the <br />proposed FY 2023/24 and 2024/25 operating and capital budget and the four-year capital <br />improvement program, the City Council received an update on the City’s projected financial <br />health beyond FY 2024/25. At that time, staff developed and presented two long-range <br />financial forecast scenarios, normal and recession, and both scenarios showed the City facing <br />an ongoing, structural budget gap. In this forecasting, various assumptions must be made in <br />developing any forecast model using the best available information that is neither overly <br />optimistic or pessimistic, and updated as new information becomes available. Below is a <br />summary of assumptions utilized in projecting numbers starting in FY 2025/26 for the baseline <br />scenario. <br /> <br />Baseline Scenario <br />In the baseline scenario, revenue assumptions include property tax - the City’s largest <br />revenue source - growing at 3.5 percent annually, sales tax - the second largest revenue <br />source - growing at 2.0 percent annually, Interfund Charges and Recreation Fees growing at <br />3.0 percent annually, and all other revenues growing at 2.0 percent annually. <br /> <br />Expenditure assumptions include personnel costs (the City’s largest expenditure category) <br />growing by approximately 3.3 percent annually. Salary and general benefit cost categories are <br />assumed to increase at 3.0 percent, but the overall increase is greater mostly due to growing <br />pension liabilities through FY 2030/31 based on the projection provided by CalPERS. Non- <br />personnel costs are collectively projected to grow by approximately 2.7 percent annually. <br />Additionally, an annual contribution to capital funds ranges from $3.0 million in FY 2025/26 to <br />$4.5 million in FY 2032/33. An average annual contribution of approximately $5.9 million, in <br />addition to the baseline capital contribution, is also included in the forecast model to fund <br />deferred infrastructure maintenance costs. Combined, these contributions represent a small <br />fraction of the overall deferred infrastructure maintenance needs based on staff’s preliminary <br />infrastructure assessment study from March 2023. <br /> <br />Based on these assumptions, the baseline scenario projects an average annual deficit of <br />approximately $13.8 million. Staff is evaluating shortfall reduction measures to reduce the <br />deficit. A first option is to utilize the Section 115 Pension Trust the City established in June <br />2018. With a balance of $46.3 million as of June 2023, the current proposed plan includes <br />utilizing approximately $6.6 million annually from FY 2025/26 to FY 2031/32. Funds will not be <br />available after FY 2031/32. Staff recently hired a pension actuarial consultant to determine <br />how to best utilize the trust over the next several years, and based on this study’s outcome <br />staff will adjust the forecast accordingly. A second option involves a series of non-personnel <br />budget reductions. Based on preliminary analysis, reductions equivalent to approximately $2.3 <br />million have been included in the forecast. After accounting for these two deficit reduction <br />measures, the baseline forecast scenario shows an average annual deficit of approximately <br />$5.7 million. <br /> <br />Economic Slowdown/Recession Scenario <br />In the economic slowdown/recession scenario, revenue assumptions are: growth in property <br />tax revenue is projected to moderate to 3.0 percent in FY 2025/26 and 2.0 percent in FY <br />2026/27 before rebounding back up to 3.0 percent in FY 2027/28, 3.2 percent in FY 2028/29, <br />and 3.5 percent thereafter starting in FY 2029/30; sales tax is projected to decrease by 5.0 <br />percent in FY 2025/26 and decrease by an additional 2.0 percent in FY 2026/27 before <br />growing again at 2.0 percent annually starting in FY 2027/28. Other taxes, including Transient <br />Page 215 of 228
The URL can be used to link to this page
Your browser does not support the video tag.