My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />3: Hopyard Rd & N Valley Trails Dr/Arthur Dr 10/17/2023 <br />3200 Hopyard Rd: Existing plus Project AM Synchro 11 Report <br />Page 3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 171 1 33 3 0 40 15 1172 2 23 1471 117 <br />Future Volume (vph) 171 1 33 3 0 40 15 1172 2 23 1471 117 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.97 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.85 1.00 0.85 1.00 1.00 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1770 1583 1770 1560 1770 5084 1770 5085 1534 <br />Flt Permitted 0.73 1.00 0.45 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1349 1583 846 1560 1770 5084 1770 5085 1534 <br />Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Adj. Flow (vph) 184 1 35 3 0 43 16 1260 2 25 1582 126 <br />RTOR Reduction (vph) 0 0 28 0 0 34 0000025 <br />Lane Group Flow (vph) 0 185 7039161262 0 25 1582 101 <br />Confl. Peds. (#/hr) 3 3 3 4 <br />Confl. Bikes (#/hr)12 <br />Turn Type Perm NA Perm Perm NA Perm Prot NA Prot NA Perm <br />Protected Phases 4 4 5 2 1 6 <br />Permitted Phases 4 4 4 4 6 <br />Actuated Green, G (s) 23.4 23.4 23.4 23.4 2.7 78.4 4.3 80.0 80.0 <br />Effective Green, g (s) 24.0 24.0 24.0 24.0 2.7 79.7 4.3 81.3 81.3 <br />Actuated g/C Ratio 0.20 0.20 0.20 0.20 0.02 0.66 0.04 0.68 0.68 <br />Clearance Time (s) 4.6 4.6 4.6 4.6 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 2.0 3.5 2.0 3.5 3.5 <br />Lane Grp Cap (vph) 269 316 169 312 39 3376 63 3445 1039 <br />v/s Ratio Prot 0.01 0.25 c0.01 c0.31 <br />v/s Ratio Perm c0.14 0.00 0.00 0.01 0.07 <br />v/c Ratio 0.69 0.02 0.02 0.03 0.41 0.37 0.40 0.46 0.10 <br />Uniform Delay, d1 44.5 38.6 38.5 38.6 57.9 9.0 56.6 9.1 6.7 <br />Progression Factor 1.00 1.00 1.00 1.00 1.37 0.31 1.27 0.27 0.02 <br />Incremental Delay, d2 7.1 0.0 0.0 0.0 2.5 0.3 1.3 0.4 0.2 <br />Delay (s) 51.6 38.6 38.6 38.6 81.6 3.1 73.2 2.8 0.3 <br />Level of Service D D D D F A E A A <br />Approach Delay (s) 49.6 38.6 4.1 3.6 <br />Approach LOS D D A A <br />Intersection Summary <br />HCM 2000 Control Delay 7.4 HCM 2000 Level of Service A <br />HCM 2000 Volume to Capacity ratio 0.51 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 <br />Intersection Capacity Utilization 51.3% ICU Level of Service A <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.