My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />4: Hopyard Rd & W Las Positas Blvd 10/17/2023 <br />3200 Hopyard Rd: Existing plus Project AM Synchro 11 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 120 403 396 305 423 45 319 758 308 72 946 94 <br />Future Volume (vph) 120 403 396 305 423 45 319 758 308 72 946 94 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.98 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 3433 3539 1563 3433 3539 1562 3433 5085 1583 3433 5085 1544 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 3433 3539 1563 3433 3539 1562 3433 5085 1583 3433 5085 1544 <br />Peak-hour factor, PHF 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 <br />Adj. Flow (vph) 140 469 460 355 492 52 371 881 358 84 1100 109 <br />RTOR Reduction (vph)0000000000023 <br />Lane Group Flow (vph) 140 469 460 355 492 52 371 881 358 84 1100 86 <br />Confl. Peds. (#/hr) 2 6 2 <br />Confl. Bikes (#/hr)1 <br />Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3% <br />Turn Type Prot NA Free Prot NA Free Prot NA Free Prot NA Perm <br />Protected Phases 7 4 3 8 5 2 1 6 <br />Permitted Phases Free Free Free 6 <br />Actuated Green, G (s) 9.0 22.1 120.0 16.4 29.5 120.0 14.8 57.1 120.0 6.2 48.1 48.1 <br />Effective Green, g (s) 9.0 23.0 120.0 16.4 30.4 120.0 14.8 58.4 120.0 6.2 49.8 49.8 <br />Actuated g/C Ratio 0.08 0.19 1.00 0.14 0.25 1.00 0.12 0.49 1.00 0.05 0.41 0.41 <br />Clearance Time (s) 4.0 4.9 4.0 4.9 4.0 5.3 4.0 5.7 5.7 <br />Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 3.0 2.0 3.0 3.0 <br />Lane Grp Cap (vph) 257 678 1563 469 896 1562 423 2474 1583 177 2110 640 <br />v/s Ratio Prot 0.04 c0.13 c0.10 0.14 c0.11 0.17 0.02 c0.22 <br />v/s Ratio Perm 0.29 0.03 0.23 0.06 <br />v/c Ratio 0.54 0.69 0.29 0.76 0.55 0.03 0.88 0.36 0.23 0.47 0.52 0.13 <br />Uniform Delay, d1 53.5 45.2 0.0 49.9 38.9 0.0 51.7 19.1 0.0 55.3 26.2 21.7 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.78 0.59 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 1.3 3.1 0.5 6.1 0.7 0.0 17.0 0.4 0.3 0.7 0.9 0.4 <br />Delay (s) 54.8 48.3 0.5 56.0 39.5 0.0 57.1 11.6 0.3 56.0 27.1 22.2 <br />Level of Service D D A E D AEBAECC <br />Approach Delay (s) 28.6 43.8 19.6 28.6 <br />Approach LOS C D B C <br />Intersection Summary <br />HCM 2000 Control Delay 28.4 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.65 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 66.6% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.