My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />1: Hopyard Rd & Valley Ave 10/17/2023 <br />3200 Hopyard Rd: Approved AM Synchro 11 Report <br />Page 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 520 130 40 30 300 610 40 790 50 250 470 720 <br />Future Volume (vph) 520 130 40 30 300 610 40 790 50 250 470 720 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.91 0.91 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.97 0.95 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1610 3281 1555 1770 3539 1562 1770 3539 1541 3433 3539 1562 <br />Flt Permitted 0.95 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1610 3281 1555 1770 3539 1562 1770 3539 1541 3433 3539 1562 <br />Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 <br />Adj. Flow (vph) 571 143 44 33 330 670 44 868 55 275 516 791 <br />RTOR Reduction (vph) 0 0 35 0000033000 <br />Lane Group Flow (vph) 285 429 9 33 330 670 44 868 22 275 516 791 <br />Confl. Peds. (#/hr)4463 <br />Confl. Bikes (#/hr)92 <br />Turn Type Split NA Perm Split NA Free Prot NA Perm Prot NA Free <br />Protected Phases 3 3 4 4 5 2 1 6 <br />Permitted Phases 3 Free 2 Free <br />Actuated Green, G (s) 23.9 23.9 23.9 16.6 16.6 120.0 5.6 46.6 46.6 13.8 54.8 120.0 <br />Effective Green, g (s) 24.8 24.8 24.8 17.5 17.5 120.0 5.6 47.9 47.9 13.8 56.1 120.0 <br />Actuated g/C Ratio 0.21 0.21 0.21 0.15 0.15 1.00 0.05 0.40 0.40 0.12 0.47 1.00 <br />Clearance Time (s) 4.9 4.9 4.9 4.9 4.9 4.0 5.3 5.3 4.0 5.3 <br />Vehicle Extension (s) 2.5 2.5 2.5 2.0 2.0 2.0 2.5 2.5 2.0 2.0 <br />Lane Grp Cap (vph) 332 678 321 258 516 1562 82 1412 615 394 1654 1562 <br />v/s Ratio Prot c0.18 0.13 0.02 c0.09 0.02 c0.25 c0.08 0.15 <br />v/s Ratio Perm 0.01 0.43 0.01 0.51 <br />v/c Ratio 0.86 0.63 0.03 0.13 0.64 0.43 0.54 0.61 0.04 0.70 0.31 0.51 <br />Uniform Delay, d1 45.9 43.4 38.0 44.6 48.3 0.0 55.9 28.7 22.0 51.1 19.9 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.72 0.97 1.00 <br />Incremental Delay, d2 19.0 1.7 0.0 0.1 1.9 0.9 3.4 2.0 0.1 4.0 0.5 1.1 <br />Delay (s) 64.9 45.1 38.0 44.7 50.2 0.9 59.3 30.7 22.1 40.8 19.8 1.1 <br />Level of Service E DDDDAECCDBA <br />Approach Delay (s) 52.2 18.0 31.5 14.1 <br />Approach LOS D B C B <br />Intersection Summary <br />HCM 2000 Control Delay 25.6 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.69 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 67.4% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.