Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Approved AM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 120 10 60 50 10 50 80 1900 30 40 1320 110 <br />Future Volume (vph) 120 10 60 50 10 50 80 1900 30 40 1320 110 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 0.98 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.97 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1765 1589 1765 1863 1562 1770 5085 1561 1770 5085 1529 <br />Flt Permitted 0.75 1.00 0.64 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1394 1589 1185 1863 1562 1770 5085 1561 1770 5085 1529 <br />Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Adj. Flow (vph) 129 11 65 54 11 54 86 2043 32 43 1419 118 <br />RTOR Reduction (vph) 0 58 00000000034 <br />Lane Group Flow (vph) 129 18 0 54 11 54 86 2043 32 43 1419 84 <br />Confl. Peds. (#/hr) 3 4 4 3 4 3 <br />Confl. Bikes (#/hr)4248 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 23.6 11.4 16.0 7.6 120.0 9.0 74.9 120.0 7.2 73.1 73.1 <br />Effective Green, g (s) 23.6 12.2 16.0 8.4 120.0 9.0 76.2 120.0 7.2 74.4 74.4 <br />Actuated g/C Ratio 0.20 0.10 0.13 0.07 1.00 0.08 0.64 1.00 0.06 0.62 0.62 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 311 161 198 130 1562 132 3228 1561 106 3152 947 <br />v/s Ratio Prot c0.04 0.01 0.02 0.01 c0.05 c0.40 0.02 0.28 <br />v/s Ratio Perm c0.04 0.02 c0.03 0.02 0.06 <br />v/c Ratio 0.41 0.11 0.27 0.08 0.03 0.65 0.63 0.02 0.41 0.45 0.09 <br />Uniform Delay, d1 42.7 49.0 47.7 52.2 0.0 54.0 13.4 0.0 54.3 12.0 9.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.22 0.57 1.00 1.04 0.64 0.70 <br />Incremental Delay, d2 0.7 0.1 0.7 0.1 0.0 7.1 0.8 0.0 2.3 0.4 0.2 <br />Delay (s) 43.3 49.1 48.4 52.3 0.0 73.0 8.4 0.0 58.7 8.2 6.6 <br />Level of Service D D D D AEAAEAA <br />Approach Delay (s) 45.5 26.8 10.9 9.4 <br />Approach LOS D C B A <br />Intersection Summary <br />HCM 2000 Control Delay 12.5 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.61 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 65.9% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group