My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />4: Hopyard Rd & W Las Positas Blvd 10/17/2023 <br />3200 Hopyard Rd: Approved AM Synchro 11 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 170 400 430 360 370 50 340 1420 540 120 780 80 <br />Future Volume (vph) 170 400 430 360 370 50 340 1420 540 120 780 80 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 3433 3539 1561 3433 3539 1554 3433 5085 1559 3433 5085 1545 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 3433 3539 1561 3433 3539 1554 3433 5085 1559 3433 5085 1545 <br />Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 <br />Adj. Flow (vph) 200 471 506 424 435 59 400 1671 635 141 918 94 <br />RTOR Reduction (vph)0000000000024 <br />Lane Group Flow (vph) 200 471 506 424 435 59 400 1671 635 141 918 70 <br />Confl. Peds. (#/hr) 5 19 3 <br />Confl. Bikes (#/hr) 3 3 10 5 <br />Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3% <br />Turn Type Prot NA Free Prot NA Free Prot NA Free Prot NA Perm <br />Protected Phases 7 4 3 8 5 2 1 6 <br />Permitted Phases Free Free Free 6 <br />Actuated Green, G (s) 10.2 22.2 120.0 19.5 31.5 120.0 14.0 51.8 120.0 8.3 45.7 45.7 <br />Effective Green, g (s) 10.2 23.1 120.0 19.5 32.4 120.0 14.0 53.1 120.0 8.3 47.4 47.4 <br />Actuated g/C Ratio 0.08 0.19 1.00 0.16 0.27 1.00 0.12 0.44 1.00 0.07 0.39 0.39 <br />Clearance Time (s) 4.0 4.9 4.0 4.9 4.0 5.3 4.0 5.7 5.7 <br />Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 3.0 2.0 3.0 3.0 <br />Lane Grp Cap (vph) 291 681 1561 557 955 1554 400 2250 1559 237 2008 610 <br />v/s Ratio Prot 0.06 c0.13 c0.12 0.12 c0.12 c0.33 0.04 0.18 <br />v/s Ratio Perm 0.32 0.04 c0.41 0.05 <br />v/c Ratio 0.69 0.69 0.32 0.76 0.46 0.04 1.00 0.74 0.41 0.59 0.46 0.11 <br />Uniform Delay, d1 53.4 45.1 0.0 48.0 36.5 0.0 53.0 27.8 0.0 54.2 26.8 23.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.77 0.61 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 5.3 3.0 0.6 5.5 0.3 0.0 40.0 1.8 0.6 2.7 0.8 0.4 <br />Delay (s) 58.6 48.2 0.6 53.5 36.8 0.0 80.6 18.9 0.6 56.9 27.6 23.4 <br />Level of Service E D A D D A F B A E C C <br />Approach Delay (s) 29.5 42.2 23.7 30.8 <br />Approach LOS CDCC <br />Intersection Summary <br />HCM 2000 Control Delay 29.1 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.74 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 69.8% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.