Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />1: Hopyard Rd & Valley Ave 10/17/2023 <br />3200 Hopyard Rd: Approved PM Synchro 11 Report <br />Page 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 460 320 70 60 170 470 80 550 60 620 800 530 <br />Future Volume (vph) 460 320 70 60 170 470 80 550 60 620 800 530 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.91 0.91 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.97 0.95 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1610 3325 1559 1770 3539 1559 1770 3539 1529 3433 3539 1562 <br />Flt Permitted 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1610 3325 1559 1770 3539 1559 1770 3539 1529 3433 3539 1562 <br />Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 <br />Adj. Flow (vph) 489 340 74 64 181 500 85 585 64 660 851 564 <br />RTOR Reduction (vph) 0 0 59 0000043000 <br />Lane Group Flow (vph) 269 560 15 64 181 500 85 585 21 660 851 564 <br />Confl. Peds. (#/hr) 10 11 5 <br />Confl. Bikes (#/hr) 3 1 7 <br />Turn Type Split NA Perm Split NA Free Prot NA Perm Prot NA Free <br />Protected Phases 3 3 4 4 5 2 1 6 <br />Permitted Phases 3 Free 2 Free <br />Actuated Green, G (s) 23.5 23.5 23.5 12.8 12.8 120.0 8.5 38.2 38.2 26.4 56.1 120.0 <br />Effective Green, g (s) 24.4 24.4 24.4 13.7 13.7 120.0 8.5 39.5 39.5 26.4 57.4 120.0 <br />Actuated g/C Ratio 0.20 0.20 0.20 0.11 0.11 1.00 0.07 0.33 0.33 0.22 0.48 1.00 <br />Clearance Time (s) 4.9 4.9 4.9 4.9 4.9 4.0 5.3 5.3 4.0 5.3 <br />Vehicle Extension (s) 2.5 2.5 2.5 2.0 2.0 2.0 2.5 2.5 2.0 2.0 <br />Lane Grp Cap (vph) 327 676 316 202 404 1559 125 1164 503 755 1692 1562 <br />v/s Ratio Prot 0.17 c0.17 0.04 0.05 0.05 0.17 c0.19 c0.24 <br />v/s Ratio Perm 0.01 0.32 0.01 c0.36 <br />v/c Ratio 0.82 0.83 0.05 0.32 0.45 0.32 0.68 0.50 0.04 0.87 0.50 0.36 <br />Uniform Delay, d1 45.7 45.8 38.5 48.8 49.6 0.0 54.4 32.4 27.4 45.2 21.5 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 0.60 1.00 <br />Incremental Delay, d2 15.0 8.1 0.0 0.3 0.3 0.5 11.5 1.6 0.2 9.2 0.9 0.5 <br />Delay (s) 60.7 53.9 38.5 49.2 49.9 0.5 65.9 33.9 27.5 49.9 13.7 0.5 <br />Level of Service E DDDDAECCDBA <br />Approach Delay (s) 54.7 16.7 37.1 21.7 <br />Approach LOS D B D C <br />Intersection Summary <br />HCM 2000 Control Delay 30.1 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.68 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 73.4% ICU Level of Service D <br />Analysis Period (min) 15 <br />c Critical Lane Group