My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />1: Hopyard Rd & Valley Ave 10/17/2023 <br />3200 Hopyard Rd: Buildout PM Synchro 11 Report <br />Page 1 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 460 320 70 60 210 650 90 590 80 620 720 590 <br />Future Volume (vph) 460 320 70 60 210 650 90 590 80 620 720 590 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.91 0.91 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.97 0.95 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.98 1.00 1.00 0.98 1.00 1.00 0.97 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1610 3325 1559 1770 3539 1559 1770 3539 1529 3433 3539 1562 <br />Flt Permitted 0.95 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1610 3325 1559 1770 3539 1559 1770 3539 1529 3433 3539 1562 <br />Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 <br />Adj. Flow (vph) 489 340 74 64 223 691 96 628 85 660 766 628 <br />RTOR Reduction (vph) 0 0 59 0000058000 <br />Lane Group Flow (vph) 269 560 15 64 223 691 96 628 27 660 766 628 <br />Confl. Peds. (#/hr) 10 11 5 <br />Confl. Bikes (#/hr) 3 1 7 <br />Turn Type Split NA Perm Split NA Free Prot NA Perm Prot NA Free <br />Protected Phases 3 3 4 4 5 2 1 6 <br />Permitted Phases 3 Free 2 Free <br />Actuated Green, G (s) 23.5 23.5 23.5 13.8 13.8 120.0 10.2 37.2 37.2 26.4 53.4 120.0 <br />Effective Green, g (s) 24.4 24.4 24.4 14.7 14.7 120.0 10.2 38.5 38.5 26.4 54.7 120.0 <br />Actuated g/C Ratio 0.20 0.20 0.20 0.12 0.12 1.00 0.08 0.32 0.32 0.22 0.46 1.00 <br />Clearance Time (s) 4.9 4.9 4.9 4.9 4.9 4.0 5.3 5.3 4.0 5.3 <br />Vehicle Extension (s) 2.5 2.5 2.5 2.0 2.0 2.0 2.5 2.5 2.0 2.0 <br />Lane Grp Cap (vph) 327 676 316 216 433 1559 150 1135 490 755 1613 1562 <br />v/s Ratio Prot 0.17 c0.17 0.04 0.06 0.05 c0.18 c0.19 0.22 <br />v/s Ratio Perm 0.01 c0.44 0.02 0.40 <br />v/c Ratio 0.82 0.83 0.05 0.30 0.52 0.44 0.64 0.55 0.06 0.87 0.47 0.40 <br />Uniform Delay, d1 45.7 45.8 38.5 47.9 49.3 0.0 53.1 33.6 28.2 45.2 22.7 0.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.89 0.62 1.00 <br />Incremental Delay, d2 15.0 8.1 0.0 0.3 0.4 0.9 6.8 1.9 0.2 9.4 0.9 0.7 <br />Delay (s) 60.7 53.9 38.5 48.2 49.7 0.9 59.9 35.6 28.4 49.8 15.0 0.7 <br />Level of Service E DDDDAEDCDBA <br />Approach Delay (s) 54.7 15.1 37.7 21.8 <br />Approach LOS D B D C <br />Intersection Summary <br />HCM 2000 Control Delay 29.4 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.70 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 74.2% ICU Level of Service D <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.