My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Buildout PM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 100 10 100 90 10 90 110 1370 230 330 1670 150 <br />Future Volume (vph) 100 10 100 90 10 90 110 1370 230 330 1670 150 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.98 1.00 1.00 0.96 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.86 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1765 1610 1770 1863 1563 1770 5085 1558 1770 5085 1520 <br />Flt Permitted 0.75 1.00 0.53 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1394 1610 980 1863 1563 1770 5085 1558 1770 5085 1520 <br />Peak-hour factor, PHF 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Adj. Flow (vph) 105 11 105 95 11 95 116 1442 242 347 1758 158 <br />RTOR Reduction (vph) 0 98 00000000039 <br />Lane Group Flow (vph) 105 18 0 95 11 95 116 1442 242 347 1758 119 <br />Confl. Peds. (#/hr) 3 3 7 6 <br />Confl. Bikes (#/hr)92 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 22.7 6.9 24.1 7.6 120.0 12.6 60.5 120.0 18.0 65.9 65.9 <br />Effective Green, g (s) 22.7 7.7 24.1 8.4 120.0 12.6 61.8 120.0 18.0 67.2 67.2 <br />Actuated g/C Ratio 0.19 0.06 0.20 0.07 1.00 0.10 0.51 1.00 0.15 0.56 0.56 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 312 103 305 130 1563 185 2618 1558 265 2847 851 <br />v/s Ratio Prot c0.04 0.01 0.04 0.01 c0.07 0.28 c0.20 c0.35 <br />v/s Ratio Perm 0.02 c0.02 0.06 c0.16 0.08 <br />v/c Ratio 0.34 0.17 0.31 0.08 0.06 0.63 0.55 0.16 1.31 0.62 0.14 <br />Uniform Delay, d1 42.3 53.1 43.1 52.2 0.0 51.4 19.7 0.0 51.0 17.8 12.6 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 0.90 0.75 1.00 0.62 0.20 0.12 <br />Incremental Delay, d2 0.5 0.3 0.6 0.1 0.1 3.9 0.7 0.2 159.8 0.8 0.3 <br />Delay (s) 42.8 53.4 43.7 52.3 0.1 50.3 15.4 0.2 191.6 4.5 1.8 <br />Level of Service D D D D A D B A F A A <br />Approach Delay (s) 48.4 23.5 15.6 33.0 <br />Approach LOS D C B C <br />Intersection Summary <br />HCM 2000 Control Delay 26.3 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.65 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 67.8% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.