My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0604
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:35:17 AM
Creation date
5/30/2024 8:32:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coordinates for all installed stormwater treatment facilities, hydromodification <br />management measures, and trash capture devices. The coordinates shall be in a format <br />determined in one of two formats: <br />i.GIS layer (shape file or feature class in a geodatabase): At minimum, provide a <br />GIS point layer of the facility inlet, and the GIS polygon layer of facility <br />footprint. Layer(s) shall contain the device type, manufacturer, model, and date <br />it was installed, and area draining to the device. <br />ii.Excel file (csv or text file) with the information noted above, in addition to a <br />coordinate location pair of Latitude/Longitude or X/Y Coordinates in North <br />American Datum (NAD) 1983 State Plane California III FIPS 0403 Feet, <br />WKID: 2227, Authority: EPSG. <br />E.Hydromodification management measures. <br />1.Regulated Projects that are designated as Hydromodification Management projects under the <br />MRP shall demonstrate that the project will not cause an increase in stormwater runoff flow <br />rates, volume, or flow durations over the pre-project existing condition based on the design <br />criteria set forth in the MRP. <br />2.Hydromodification Management Projects shall implement on-site hydromodification <br />management controls unless a regional hydromodification management control is available to <br />control all or a portion of the project runoff. <br />F.Requirement for Stormwater Management Plan. A Stormwater Management Plan shall consist of a <br />preliminary plan to ensure adequate planning for the management of stormwater runoff and quality <br />control, and a final plan, as approved by a designee of the Public Works Director or City Engineer. <br />Both plans shall be in accordance with the criteria established in the following provisions: <br />1.A preliminary Stormwater Management Plan shall be submitted for review and approval with <br />all subdivision map, site plan, building permit, or improvement plan applications if governed <br />by this Chapter. <br />2.The final Stormwater Management Plan must be submitted for review and approval by the <br />Public Works Director or City Engineer as part of the improvement plan review process. <br />3.All Stormwater Management Plans shall be appropriately sealed and signed by a professional <br />engineer in adherence to all minimum standards and requirements pertaining to the practice <br />of that profession. <br />4.The stormwater treatment systems must be designed in accordance with the requirements <br />specified in the MRP and with the design guidelines detailed in the most recent C.3 <br />Technical Guidance Manual <br />G.Maintenance access easements. <br />1.The Responsible Person must ensure access from the public right-of-way to stormwater <br />treatment systems for the purpose of inspection, maintenance, and repair by securing all the <br />maintenance access easements needed on a permanent basis. Such access shall be sufficient <br />for all necessary equipment materials and personnel. The maintenance access easement must <br />Page 295 of 428
The URL can be used to link to this page
Your browser does not support the video tag.