Laserfiche WebLink
be located such that the stormwater treatment systems are readily accessible for inspection <br />purposes during regular working hours. <br />H.Inspection of systems. The authorized enforcement official shall have the authority to inspect the <br />stormwater treatment and HM systems during construction and life of the project pursuant to Sections <br />9.14.170 - 9.14.280. <br />I.Inadequacy of the system. <br />1.If a stormwater treatment or HM system is found to be inadequate by virtue of physical <br />evidence of operational failure, even though it was built as called for in the approved <br />stormwater management plan, it shall be corrected by the Responsible Person before the <br />development project is finalized and accepted. <br />2.If a stormwater treatment or HM system is found to be inadequate by virtue of physical <br />evidence of operational failure at any point during its operating life, it shall be corrected by <br />the Responsible Person. If the Responsible Person fails to act, the City of Pleasanton may <br />pursue corrective actions or enforcement pursuant to Sections 9.14.170 - 9.14.280 of the <br />Pleasanton Municipal Code. <br />J.LID/GSI requirements for projects improving street, sidewalk, or road frontage. Portions of the public <br />right of way that may generate runoff, including sidewalks, curb extensions, pavement replacement, <br />and curb and gutter replacement in the street frontage, that are constructed or reconstructed as part of <br />the Regulated Project are considered part of the regulated project. <br />K.Additional measures. The provisions of this section shall not prohibit an authorized enforcement <br />official from requiring a discharger to take additional measures to achieve the objectives of this <br />chapter or any permit. <br />§ 9.14.150 Trash reduction requirements for development projects <br />Development projects, including tenant improvement projects, shall conform to the MRP Provision C.10 <br />Trash Load Reduction. <br />A. Full trash capture systems or devices and actions. <br />1. All development projects are required to install on-site full trash capture systems or devices <br />selected from the list of full capture systems or multi-benefit trash treatment systems certified by <br />the State Water Board or implement trash control actions that provides for an equivalent trash <br />reduction. <br />2. Full trash capture devices installed shall be on the Alameda County Mosquito Abatement District <br />list of approved devices. Alternately, development projects may install regional, off-site full trash <br />capture devices if approved by the City of Pleasanton. <br />3. Full trash capture systems or devices are required to remain in place throughout the life of the <br />development project to reduce trash loads from the MS4. Applicants for development projects <br />shall select, design, and construct full trash capture systems or devices, as applicable, to the <br />satisfaction of the [City of Pleasanton] in accordance with the requirements and guidelines set <br />forth in the most current version of following documents: <br />a. MRP <br />Page 296 of 428