My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br /> <br />The assessments for the coming year for District 1993-1 (Windsor) will be the same as last <br />year at $269.62 per privately-owned parcel. With a total of 90 parcels in the district, this year's <br />total assessment will be $24,265.80. This amount is not enough to fund the maintenance of the <br />district areas to the same level of maintenance as in past years. The county assessment fee <br />will continue to be paid, as will the City administration fee, but due to the increasing cost of <br />water and maintenance services and the aging plant material, irrigation system, and <br />improvements, the cash reserve for the district has been depleted. <br /> <br />Despite a significant reduction in the level of maintenance of the landscaped areas, there is a <br />fund deficit of $14,000 for this district due to the significant irrigation breaks and repairs and <br />the tree and tree limb failures that have occurred over the last few years. The winter storms of <br />2023/24 especially impacted the trees in the Windsor LMD due to a lack of funding for <br />pruning. <br /> <br />Staff began the process of increasing the assessments for the Windsor LMD in early 2022 by <br />initiating a Proposition 218 discussion about an assessment increase. However, the HOA <br />instead chose to accept responsibility for the routine plant maintenance and water costs and <br />entered into an agreement with the City to do so in February 2024. This positive step forward <br />from the HOA equates to approximately $17,000 annually in cost reductions to the LMD. The <br />other LMD maintenance responsibilities beyond plant care and water costs, such as <br />maintenance of the sound wall, irrigation repairs, tree pruning, etc., continue to be managed by <br />the City as part of the Windsor LMD. <br /> <br />Although the transfer of the routine LMD maintenance responsibilities and water costs to the <br />Windsor HOA is a significant step toward returning the LMD to a positive fund balance, an <br />increase in the annual assessment will still be necessary over the long term to continue the <br />maintenance standards of the district and replenish the reserve needed to fund eventual <br />capital repair and replacement costs. <br /> <br />Landscape Maintenance District 1993-2, Bonde Ranch <br />The Bonde Ranch subdivision (District 1993-2) has 103 parcels, and the district has been in <br />place for 31 years. Maintenance in this district includes the care of entry features, open space <br />areas, firebreaks, trees, shrubbery, groundcover and irrigation systems for the subdivision <br />(Tracts 6483 and 6518 in the city of Pleasanton). <br /> <br />The assessments for the coming year for District 1993-2 (Bonde Ranch) will be the same as <br />last year at $257.22 per privately-owned parcel and $252.91 for the one City-owned parcel. <br />With a total of 103 parcels in the district (including the City-owned Bonde Ranch water tank <br />parcel), this year's total assessment will be $26,489.35. The assessments are not enough to <br />fund the maintenance of the district areas to the same level as in past years. This amount will <br />fund the district’s reduced maintenance, County assessment fees, and City administration fees <br />but will not fund capital repair or replacement costs. <br /> <br />Despite shutting off the water due to existing leaks in the irrigation system, the district’s fund <br />balance of $25,000 for Bonde Ranch is insufficient for other basic maintenance tasks such as <br />mulch replacement and more extensive fence repair, replacement, and painting. An increase in <br />the annual assessment will be necessary to continue the maintenance standards of the district <br />and replenish the reserve needed to fund eventual capital repair and replacement costs. <br />Page 142 of 248
The URL can be used to link to this page
Your browser does not support the video tag.