My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WHEREAS, the SB-1 project list and overall investment in our local streets and roads <br />infrastructure with a focus on basic maintenance and safety, investing in complete streets <br />infrastructure, and using cutting-edge technology, materials and practices, will have significant <br />positive co-benefits statewide. <br />NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF <br />PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br />SECTION 1. The foregoing recitals are true and correct. <br />SECTION 2. Amends the Streets CIP for fiscal year 24/25, incorporating the following <br />planned project to be funded with Road Maintenance and Rehabilitation Account revenues: <br />Annual Resurfacing and Reconstruction of Various Streets, CIP No. 25503. <br />The project will resurface 533,000 square feet of various streets throughout the City <br />during summer 2025 at the following locations: <br />STREET NAME BEGIN LOCATION END LOCATION <br />HANSEN DR CALLE REYNOSO VALLEY AVE <br />PASEO SANTA CRUZ HANSEN DR CORTE SANTA MARIA <br />PASEO SANTA CRUZ CORTE SANTA MARIA VIA DE LOS CERROS <br />VIA DE LOS CERROS PASEO SANTA CRUZ VALLEY AVE <br />CALLE DE LA LOMA PASEO SANTA MARIA VIA DE LOS CERROS <br />CAMINO SEGURA VIA DE LOS CERROS PASEO SANTA CRUZ <br />CAMINO DEL CINO CAMINO DEL LAGO <br />(WEST) <br />CAMINO DEL LAGO (EAST) <br />CORTE DEL CINO CAMINO DEL LAGO END <br />CORTE MERCADO PASEO SANTA CRUZ END <br />CAMINO DEL LAGO PASEO SANTA CRUZ CAMINO SEGURA <br />CORTE DEL VISTA PASEO SANTA CRUZ END <br />CALLE ALTAMIRA S/O CORTE MONTEREY PASEO SANTA CRUZ <br />CALLE ALTAMIRA CALLE REYNOSO S/O CORTE MONTEREY <br />CORTE MATEO CALLE ALTAMIRA END <br />CORTE ANTONIO PASEO SANTA CRUZ END <br />BLACK AVE 38 FT. E/O CALLE <br />RICARDO <br />106 FT. W/O CAMINO BRAZOS <br />(WEST) <br />W. LAS POSITAS BLVD FOOTHILL RD MUIRWOOD DR <br />W. LAS POSITAS BLVD MUIRWOOD DR I-680 <br />The project will be started in spring 2025 and completed by winter 2025. The resurfacing <br />treatments will extend the useful life of the treated roadway by an additional 10 to 15 years. <br />PASSED, APPROVED AND ADOPTED by the City Council of the City of Pleasanton at <br />a regular meeting held on June 18, 2024. <br />Page 166 of 248
The URL can be used to link to this page
Your browser does not support the video tag.