Laserfiche WebLink
<br />WHEREAS, the SB-1 project list and overall investment in our local streets and roads <br />infrastructure with a focus on basic maintenance and safety, investing in complete streets <br />infrastructure, and using cutting-edge technology, materials and practices, will have significant <br />positive co-benefits statewide. <br />NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF <br />PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br />SECTION 1. The foregoing recitals are true and correct. <br />SECTION 2. Amends the Streets CIP for fiscal year 24/25, incorporating the following <br />planned project to be funded with Road Maintenance and Rehabilitation Account revenues: <br />Annual Resurfacing and Reconstruction of Various Streets, CIP No. 25503. <br />The project will resurface 533,000 square feet of various streets throughout the City <br />during summer 2025 at the following locations: <br />STREET NAME BEGIN LOCATION END LOCATION <br />HANSEN DR CALLE REYNOSO VALLEY AVE <br />PASEO SANTA CRUZ HANSEN DR CORTE SANTA MARIA <br />PASEO SANTA CRUZ CORTE SANTA MARIA VIA DE LOS CERROS <br />VIA DE LOS CERROS PASEO SANTA CRUZ VALLEY AVE <br />CALLE DE LA LOMA PASEO SANTA MARIA VIA DE LOS CERROS <br />CAMINO SEGURA VIA DE LOS CERROS PASEO SANTA CRUZ <br />CAMINO DEL CINO CAMINO DEL LAGO <br />(WEST) <br />CAMINO DEL LAGO (EAST) <br />CORTE DEL CINO CAMINO DEL LAGO END <br />CORTE MERCADO PASEO SANTA CRUZ END <br />CAMINO DEL LAGO PASEO SANTA CRUZ CAMINO SEGURA <br />CORTE DEL VISTA PASEO SANTA CRUZ END <br />CALLE ALTAMIRA S/O CORTE MONTEREY PASEO SANTA CRUZ <br />CALLE ALTAMIRA CALLE REYNOSO S/O CORTE MONTEREY <br />CORTE MATEO CALLE ALTAMIRA END <br />CORTE ANTONIO PASEO SANTA CRUZ END <br />BLACK AVE 38 FT. E/O CALLE <br />RICARDO <br />106 FT. W/O CAMINO BRAZOS <br />(WEST) <br />W. LAS POSITAS BLVD FOOTHILL RD MUIRWOOD DR <br />W. LAS POSITAS BLVD MUIRWOOD DR I-680 <br />The project will be started in spring 2025 and completed by winter 2025. The resurfacing <br />treatments will extend the useful life of the treated roadway by an additional 10 to 15 years. <br />PASSED, APPROVED AND ADOPTED by the City Council of the City of Pleasanton at <br />a regular meeting held on June 18, 2024. <br />Page 166 of 248