Page 2 of 4 <br />On October 17, 2023, the City Council approved the following actions based on the findings <br />and recommendations from the Brown and Caldwell 2023 Water Supply Alternatives Study <br />report: <br />• Proceed with the planning and development of new groundwater wells in the Bernal <br />subbasin with the goal of recovering the use of its GPQ of 3,500 acre-feet per year, and <br />• Evaluate the feasibility of conducting a joint project with Zone 7 to implement the new <br />groundwater wells. <br /> <br />In February 2024, Zone 7 and City staff completed a process outlining the collaboration terms <br />to evaluate, plan, design, construct, and operate regional groundwater facilities in the Bernal <br />subbasin. The terms of collaboration include the following elements: <br />• Goals: Implement the project to increase Zone 7’s groundwater production capacity for <br />the Tri-Valley region and recover the use of the City’s GPQ. The project should produce <br />water supply that meets and exceeds all state and federal water quality standards, <br />including regulations for PFAS. <br />• Description: The project is envisioned to include new groundwater well(s) that are tied to <br />Zone 7’s water supply system; an increase in capacity of Zone 7’s existing Hopyard <br />Treatment Facility to treat groundwater from the new well(s); new pipelines to tie the <br />new well(s) to the Hopyard Treatment Facility and Zone 7’s transmission system; and <br />delivery of the City’s GPQ by Zone 7 through Zone 7’s transmission system to City <br />turnouts. Additional improvements to the City’s distribution system will be required to <br />receive its GPQ from turnouts as opposed to directly from City-operated wells. The City <br />will evaluate and construct these improvements outside of the joint activities with Zone <br />7. <br />• Implementation: The project will be broken into three phases. Phase I evaluates the <br />feasibility and provides a basis for design. The target completion date for Phase I is <br />Spring 2025. If the project is determined to be feasible, then the governing bodies of <br />both parties will be required to provide authorization to proceed into Phase II and III. <br />Phase II involves designing and constructing the project according to the basis of the <br />design developed in Phase I. The target completion date for Phase II is the end of 2028. <br />Phase III is for the O&M of the project. This phase would start after completion of Phase <br />II and when required permits to operate are in place. <br />• Roles: Zone 7 will be the lead agency in the project’s evaluation, permitting, design, <br />construction, and O&M. The City will support Zone 7 by providing necessary land rights, <br />participating in the project team, managing community outreach within the City, and <br />sharing its fair share of costs. <br /> <br />Zone 7 is scheduled to seek Zone 7’s Board of Directors approval at its July 17, 2024, Board <br />Meeting. <br /> <br />DISCUSSION <br />A recommended agreement between the City and Zone 7 to perform Phase I of the project is <br />provided as Attachment 1. Below is a summary of the agreement terms: <br />• Scope of Work: The scope of work includes wells siting to identify the top three <br />Page 169 of 248