Page 3 of 4 <br />recommended locations for potential installation of production well facilities; exploratory <br />test drilling at the top three locations; a technical feasibility study to determine if water <br />yield and quality based on exploratory test drilling and Zone 7 groundwater modeling is <br />suitable, and if so, provide a basis of design that recommends infrastructure <br />improvements and corresponding capital and O&M costs; developing an environmental <br />review strategy for complying with the California Environmental Quality Act (CEQA) and <br />potentially the National Environmental Policy Act (NEPA); and negotiating a draft terms <br />sheet for Phase II and III of the project. <br />• Contractor/Consultant Services: Anticipated contractor and consultant services include <br />exploratory test drilling, technical feasibility review, and environmental review strategy. <br />As the lead agency, Zone 7 will enter into agreements for these services, which will <br />require authorization by Zone 7’s Board of Directors unless the amount is under the <br />authority of Zone 7’s General Manager. As part of the recommended City and Zone 7 <br />agreement, the City Council delegates authority for Zone 7 to enter into agreements for <br />these services only after approval by the Project Steering Committee, which includes <br />Zone 7’s Water Resources Manager and General Manager, and the City’s Director of <br />Public Works and City Manager. <br />• Cost Sharing: Zone 7 and the City will contribute their own staff time and resources for <br />self-performed tasks and activities. The contractor and consultant services cost will be <br />equally shared (50 percent/50 percent cost sharing) with a not-to-exceed limit of $2 <br />million dollars ($2,000,000). Any consultant or contractor agreements, change orders, or <br />amendments that exceed the not-to-exceed limit of the agreement will require approval <br />by both governing bodies. <br /> <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Citywide Climate Action Plan 2.0 (CAP) - Water <br />Resources - Reduce GHG emissions from water usage (including conveyance) and prepare <br />community water resources for a changing climate which will result in cost savings, enhance <br />water quality and availability, improve infrastructure, and increase resiliency. <br /> <br />OUTREACH <br />Phase I of the project will include community engagement efforts led by the City, including <br />notifications of exploratory drilling activities and outreach to understand and mitigate potential <br />impacts. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the Citywide ONE Pleasanton strategic goal of Investing in <br />Our Environment, Strategy 3 – Identify funding and implement the recommendations from the <br />Water Supply Alternative Study to resolve PFAS water quality issues. <br /> <br />FISCAL IMPACT <br />This project is funded by the City Groundwater Supply Project (CIP 24174). The total <br />programmed amount in the four-year Capital Improvement Program for CIP 24174 for <br />feasibility review (Phase I) and final design (first part of Phase II) is $4,000,000. Anticipated <br />City expenditures for feasibility review include $1,000,000 for activities included with the Zone <br />7 agreement and an allowance of $500,000 for potential City activities outside the Zone 7 <br />agreement. Expenditures for final design activities will occur after the completion of the <br />Page 170 of 248