My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4141352.1 1 <br /> <br />AGREEMENT BETWEEN ZONE 7 WATER AGENCY AND THE CITY OF PLEASANTON <br />FOR THE REGIONAL GROUNDWATER FACILITIES PROJECT – PHASE I <br /> <br /> <br />This Agreement (“Agreement”) is entered into on __________, 2024, between the Alameda <br />County Flood Control and Water Conservation District, Zone 7, a public body, corporate and politic, <br />(“Zone 7” or “Zone 7 Water Agency”) and the City of Pleasanton, a municipal corporation (“City”). <br />Zone 7 and City may be referred to individually as party, or collectively as parties. <br /> <br />RECITALS <br /> <br />WHEREAS, Zone 7 and the City seek to collaborate and share costs for the development of <br />supplemental groundwater extraction facilities, which would provide benefits to both parties including <br />the benefit of increased groundwater extraction capacity; and <br /> <br />WHEREAS, Zone 7 provides wholesale potable water to the Livermore Amador Valley serving <br />multiple customers, including the City, which it currently serves under the Term and Conditions <br />Adopted by the Zone 7 Board of Directors on August 16, 2000; and <br /> <br />WHEREAS, Zone 7 serves its customers via a water distribution network generally consisting <br />of approximately 42 miles, more or less, of transmission pipelines and appurtenances, 10 groundwater <br />extraction wells, and two water treatment plants; and <br /> <br />WHEREAS, in addition to its wholesale water supply function, Zone 7 is also the exclusive <br />Groundwater Sustainability Agency for the Livermore Valley Subbasin where it is responsible for <br />compliance with the Sustainable Groundwater Management Act of 2014 (SGMA); and <br /> <br />WHEREAS, the City is a retail water supplier serving approximately 80,000 people with water <br />purchased from Zone 7 or water extracted from the groundwater basin in accordance with its <br />Groundwater Production Quota (GPQ), which as of 2024 is 3,500 Acre Feet per year; and <br /> <br />WHEREAS, current testing and modeling analyses suggests that the Bernal Subbasin, which <br />lies within the Livermore Valley Groundwater Subbasin, is outside of the existing PFAS plume, and <br />worthwhile to jointly investigate the feasibility of developing groundwater projects for the parties and; <br /> <br />WHEREAS, the parties desire to evaluate the feasibility of additional groundwater extraction <br />facilities within the Bernal Subbasin, with the overall goal of producing potable water supplies that <br />meet and exceed all State and federal water quality standards while creating cost efficiencies for both <br />parties, and if feasible, constructing joint-use groundwater extraction facilities, subject to further <br />negotiations, funding, operating plans, approval from the governing bodies of each entity, and other <br />considerations; and <br /> <br />WHEREAS, this agreement is intended to set forth the framework for Phase I of these proposed <br />joint-use groundwater extraction facilities, said Phase I described herein. <br /> <br />NOW, THEREFORE, for valuable consideration of the contributions and commitments <br />hereinafter set forth, both parties desire to move forward with Phase I, and agree as follows: <br /> <br />Page 172 of 248
The URL can be used to link to this page
Your browser does not support the video tag.