<br />4141352.1 2 <br /> <br />AGREEMENT <br /> <br />The recitals hereto are true and correct and are incorporated into the body of this Agreement as set forth <br />in full. <br /> <br />1. Project Description: <br />The Regional Groundwater Facilities Project (hereinafter “Project”), which is currently in a <br />feasibility analysis and conceptual design phase, is intended to provide additional groundwater <br />extraction capacity for Zone 7 and provide groundwater extraction capabilities for the City to <br />recover its GPQ. If approved, the Project would entail the design, construction and operation <br />up to three additional groundwater extraction wells in the Bernal Groundwater Subbasin, and <br />would connect these proposed additional groundwater extraction wells to Zone 7’s existing <br />water transmission system and the existing Hopyard Wells Treatment Facility, increasing the <br />capacity of both assets where necessary. The project will also define the sustainable annual <br />pumping capacity from test well locations to recover the City’s GPQ and provide supplemental <br />groundwater pumping capacity for Zone 7. As currently conceived, Project development is <br />anticipated to have three main phases, which are summarized as follows: <br />A. Phase I – Phase I will explore the technical feasibility of the Project including the feasibility of <br />up to three additional wells in the Bernal Subbasin located within the area shown on Exhibit <br />‘B,’ attached hereto and incorporated herein. This technical feasibility includes a siting review <br />for new well locations, installing exploratory test wells to analyze potential yields and water <br />quality, and preparing reports that summarize Project feasibility and the basis of design report. <br />In Phase I, both participating entities will evaluate the project’s feasibility before making any <br />Project approvals or committing to Project implementation. Term sheets for Phase II and Phase <br />III will be developed during Phase I, for subsequent consideration by the governing boards of <br />each entity. The scope of this phase is described in full in Section 2, herein. The target date for <br />completion of Phase I is the spring of 2025. <br />B. Phase II – Phase II is anticipated to generally consist of permitting, public outreach, design, <br />construction, start-up, and other tasks. The target completion date for Phase II is the end of <br />2028. <br />C. Phase III – Phase III is anticipated to be the ongoing long-term operations and maintenance of <br />the Regional Groundwater Facilities after Project commissioning. It is currently envisioned that <br />Zone 7 would be the operator of the Project, with the City reimbursing Zone 7 for a portion of <br />the costs, including but not limited to the costs of operation, maintenance, ongoing regulatory <br />costs, renewal and replacement to be defined in the future regional groundwater Project <br />operations and maintenance agreement between the City and Zone 7. In that model, Zone 7 <br />would, upon request from the City and after any necessary scheduling, extract the City’s GPQ <br />utilizing the Regional Groundwater Facility and convey the water via Zone 7’s transmission <br />system to the City’s turnouts, at which point, the City would then be responsible for <br />conveyance, carriage, and handling of the water. <br /> <br />2. Scope of Work for Phase I: <br />The following outlines the scope of work to implement Phase I of the Project including <br />deliverables and milestones: <br />Page 173 of 248