My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4141352.1 6 <br /> <br />impacts, if any, to the sustainability of the groundwater basin from implementation of the <br />Project. The results of this groundwater modeling will be factored into the technical <br />feasibility review performed under this agreement. <br />2) City Distribution Modeling: As part of the Project concept, the Parties anticipate that the <br />City’s GPQ will be delivered by Zone 7 to the City through City turnouts. Since the City’s <br />GPQ currently is introduced directly into the distribution system through its wells, the <br />Project will result in higher flowrates through City turnouts and Zone 7’s transmission <br />system. The City will perform hydraulic modeling of its distribution system to determine <br />required turnout and distribution system improvements and costs because of this Project. <br />To perform this modeling, Zone 7 will assist and provide pressure assumptions at each <br />turnout. The City will utilize the results of this modeling to help determine the feasibility <br />of the Project. <br />− Based on the results of the scope of work from Phase I, both parties will make a <br />recommendation on project feasibility. If both parties determine the Project to be feasible, the <br />parties will work in good faith to reach an agreement to proceed into Phase II and III, said <br />agreement will need to be authorized by the respective governing bodies prior to proceeding. <br />If the parties cannot reach an agreement to proceed into Phase II and III, both parties will have <br />equal rights to the work product produced by the contractor/ consultant in Phase I of the <br />Project, and to proceed with completing subsequent phases of the Project unilaterally. <br /> <br />3. Cost-sharing: <br />Zone 7 and the City shall share the cost of Phase I equally (50/50 cost sharing) for the contractor / <br />consultant agreements that include the following with a not-to-exceed (NTE) limit of one million <br />dollars for each of the Parties and for a total of two million dollars for the total cost of Phase I: <br />A. Contractor(s) agreement to perform exploratory test drilling <br />B. Consultant(s) agreement to perform technical feasibility review <br />C. Agreements A, and B, shall include the terms set forth in the attached Exhibit A, attached <br />hereto and incorporated herein. <br />Agreements with consultants and contractors listed above will require authorization by Zone 7’s <br />Board of Directors. The City Council delegates authority for Zone 7 to enter into agreements with <br />consultants and contractors listed herein only after approval by the Steering Committee, which <br />shall be confirmed in writing by the City’s Director of Public Works. <br />Zone 7 will immediately notify and seek City’s concurrence for claim notices by contractors and <br />consultants. Any consultant / contractor agreements, change orders, or amendments that exceed the <br />not-to-exceed limit of this agreement require approval by both governing bodies prior to execution <br />and a written amendment to this agreement <br />Each agency will contribute its own staff time and resources for tasks and activities that are self- <br />performed including but not limited to: <br />A. Zone 7 – Project management, construction management, contractor/consultant management, <br />reports review and analysis, preparation of recommendations to the Steering Committee and <br />Board of Directors, and any work necessary to deliver Phase I of the Project. <br />B. City – Community engagement, report review and analysis, encroachment permits, granting of <br />rights of way, and any support work necessary to deliver Phase I of the Project. <br />Page 177 of 248
The URL can be used to link to this page
Your browser does not support the video tag.