Laserfiche WebLink
<br />4141352.1 5 <br /> <br />the reports and proceeding to Phase II. <br />− Environmental Review Strategy: Zone 7 will serve as the lead agency under CEQA for the <br />feasibility study (Phase I). In that role, Zone 7 will conduct preliminary assessment of <br />environmental compliance need for potential project alternatives for future phases. For future <br />phase II and III, since both parties may be looking to fund portions of the Project through the <br />Drinking Water State Revolving Fund (DWSRF), compliance with the National Environmental <br />Policy Act (NEPA) may also be required, and parties will consider developing environmental <br />compliance strategy in the future phases. <br />− Zone 7 Deliverables: <br />o Preliminary assessment of environmental compliance need for potential project <br />alternatives for future phases <br />− City Deliverables: <br />o Review comments to the preliminary assessment <br /> <br />− Draft Terms Sheet for Phase II and III: Zone 7 and the City will negotiate a Draft Terms Sheet <br />for performing Phase II and III of the Project. The draft terms will be based on the findings of <br />the technical feasibility review and include draft terms for the following items: <br />1) Scope of work and deliverables for Zone 7 as lead agency and City as supporting agency. <br />2) Cost sharing and payment for design and construction of groundwater facilities (currently <br />envisioned to be proportional to facility capacity rights) <br />3) Cost sharing and payment for O&M of groundwater facilities (currently envisioned to be <br />based on actual O&M costs) <br />4) Zone 7 guarantees and costs for supplying City GPQ until Phase II is complete and Phase <br />III begins. <br />5) Land right grants to construct and operate new groundwater facilities. <br />6) Groundwater facilities ownership. <br />7) Groundwater facilities capacity rights (annual and maximum day) and ability for <br />expansion by either party. <br />8) Delivery schedule of City GPQ and ability for City to go below or above GPQ on an <br />annual basis as defined in the future operations agreement. <br />9) Addition of treatment technology if required to meet future water quality regulations. <br />10) Liability <br />11) Other draft terms deemed necessary by either party. <br />− The following outlines activities by each party during Phase I that will occur outside the scope <br />of this agreement and be the sole responsibility of each party including all associated costs and <br />liability, except where noted: <br />1) Zone 7 Groundwater Modeling: Zone 7 is the Groundwater Sustainability Agency for the <br />Livermore Valley Groundwater Basin. Upon completion of the exploratory test drilling <br />activities under this agreement, Zone 7 will utilize its groundwater model to determine the <br />Page 176 of 248