My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2281 <br />Page 17 of 32 <br />emergency response: <br />a. The release of a hazardous material or hazardous waste shall be <br />immediately reported to emergency services by emergency dispatch <br />services (911). <br />b. The release of a nonhazardous waste shall be reported to the Public <br />Works Administration by phone at 925-931-5500 no later than 4:00 p.m. <br />on the same business day. If the release occurs afterhours or on weekend <br />or holidays, report to the Pleasanton Police Department nonemergency <br />line at 925-931-5100. A written notification of the release shall also be <br />made to the Director of Public Works within five business days of the <br />release. <br />2. For any discharge subject to the reporting requirements of the State of California <br />Water Code Sections 13271 and 13272, notification in compliance therewith shall <br />constitute sufficient notification for the purposes of this section. <br />§ 9.14.130 Construction Activities <br />All construction sites shall implement effective erosion control, run-on and runoff control, <br />sediment control, active treatment systems (as appropriate), good site management, <br />and non-stormwater management through all phases of construction (including, but not <br />limited to, demolition, site grading, building, and finishing of lots) until the site is fully <br />stabilized by landscaping or the installation of permanent erosion control measures. <br />Construction sites shall conform to the MRP Provision C.6 Construction Site Control <br />requirements, as well as the following requirements: <br />A. Any Person performing construction activities in The City of Pleasanton shall <br />implement appropriate BMPs to prevent the discharge of sediment, construction <br />waste, or contaminants from construction materials, tools, and equipment from <br />discharging onto ground surfaces or entering the storm drain system or <br />watercourse. <br />B. No construction activity may commence until adequate BMPs have been <br />installed conforming to MRP Provision C.6 Construction Site Control <br />requirements and the authorized enforcement official has been notified of their <br />completion. <br />C. The authorized enforcement official shall have the authority to inspect <br />construction activities within the City of Pleasanton pursuant to Sections 9.14.170 <br />- 9.14.280. <br />Page 215 of 248
The URL can be used to link to this page
Your browser does not support the video tag.