Laserfiche WebLink
Ordinance No. 2281 <br />Page 18 of 32 <br />D. When any work is being performed contrary to the provisions of this section, the <br />authorized enforcement official may order the work stopped by notice in writing <br />served on any Persons engaged in doing or causing the work to be done. Such <br />work shall stop until the authorized enforcement official authorizes the work to <br />proceed. This remedy is in addition to and does not supersede or limit any and all <br />other remedies, both civil and criminal, provided in Sections 9.14.170 - 9.14.280 <br />of the City of Pleasanton Municipal Code. <br />§ 9.14.140 Development Requirements <br />Development projects shall conform to the MRP Provision C.3 New and Redevelopment <br />Standards. <br />A. Stormwater Source Controls. Source controls as described in the MRP and in <br />further detail in the Pleasanton Standard Specification Section 5 are required for <br />all development projects doing work in the City of Pleasanton. <br />1.Architectural Copper. Copper metal roofing, copper granule containing <br />asphalt shingles, copper gutters, copper flashing, and copper architectural <br />ornaments shall not be permitted for use on any residential, commercial, <br />or industrial building for which a building permit is required. Replacement <br />roofing and gutters on historic structures are exempt, provided that the <br />roofing material used shall be pre-patinated at the factory. For the <br />purposes of this exemption, the definition of “historic” shall be as identified <br />in the City of Pleasanton’s Downtown Specific Plan. <br />B. Site design techniques. Development projects that fall into the applicable <br />thresholds as defined in the MRP shall incorporate at least one of the following <br />site design techniques, as applicable to the project: <br />1. Direct roof runoff into cisterns or rain barrels for use. <br />2. Direct roof runoff onto vegetated areas through disconnected roof leaders <br />that are properly located to prevent erosion of landscaped materials. <br />3. Direct runoff from sidewalks, walkways, patios, driveways, uncovered <br />parking onto vegetated areas. <br />4. Construct sidewalks, walkways, patios, driveways, uncovered parking, or <br />bike lanes with permeable surfaces as defined in the MRP. <br />Applicants for these projects shall select, design, and construct these site <br />design measures, as applicable, with the requirements and guidelines set <br />forth in the most current version of following documents: <br />Page 216 of 248