My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0618
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:02:59 PM
Creation date
6/18/2024 2:01:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2281 <br />Page 21 of 32 <br />criteria set forth in the MRP. <br />2. Hydromodification Management Projects shall implement on-site <br />hydromodification management controls unless a regional <br />hydromodification management control is available to control all or a <br />portion of the project runoff. <br />F. Requirement for Stormwater Management Plan. A Stormwater Management Plan <br />shall consist of a preliminary plan to ensure adequate planning for the <br />management of stormwater runoff and quality control, and a final plan, as <br />approved by a designee of the Public Works Director or City Engineer. Both <br />plans shall be in accordance with the criteria established in the following <br />provisions: <br />1. A preliminary Stormwater Management Plan shall be submitted for review <br />and approval with all subdivision map, site plan, building permit, or <br />improvement plan applications if governed by this Chapter. <br />2. The final Stormwater Management Plan must be submitted for review <br />and approval by the Public Works Director or City Engineer as part of the <br />improvement plan review process. <br />3. All Stormwater Management Plans shall be appropriately sealed and <br />signed by a professional engineer in adherence to all minimum standards <br />and requirements pertaining to the practice of that profession. <br />4. The stormwater treatment systems must be designed in accordance with <br />the requirements specified in the MRP and with the design guidelines <br />detailed in the most recent C.3 Technical Guidance Manual <br />G. Maintenance access easements. <br />1. The Responsible Person must ensure access from the public right-of-way <br />to stormwater treatment systems for the purpose of inspection, <br />maintenance, and repair by securing all the maintenance access <br />easements needed on a permanent basis. Such access shall be sufficient <br />for all necessary equipment materials and personnel. The maintenance <br />access easement must be located such that the stormwater treatment <br />systems are readily accessible for inspection purposes during regular <br />working hours. <br />H. Inspection of systems. The authorized enforcement official shall have the <br />authority to inspect the stormwater treatment and HM systems during <br />construction and life of the project pursuant to Sections 9.14.170 - 9.14.280. <br />Page 219 of 248
The URL can be used to link to this page
Your browser does not support the video tag.