Laserfiche WebLink
Ordinance No. 2281 <br />Page 20 of 32 <br />4.LID/GSI treatment measures shall not be placed in backyards or in areas <br />where fencing obstructs access for periodic inspection. <br />5. Alternative Compliance for low impact development. Notwithstanding the <br />provisions of Section 9.14.130 of the Pleasanton Municipal Code, the <br />authorized enforcement official may, in accordance with the MRP, <br />authorize a Regulated Project to provide alternate compliance by treating <br />an equivalent flow and pollutant load of the project’s stormwater runoff <br />with LID/GSI treatment measures at an on-site location that otherwise <br />would not require treatment, or at an offsite location in the same <br />watershed, in accordance with the MRP. <br />6. Construction-phase LID/GSI requirements. <br />c. Bioretention Soil Media (BSM) certification. For LID/GSI <br />incorporating bioretention, submit the certification of the BSM, as <br />set forth in the C.3 Technical Guidance Manual, provided by the <br />BSM supplier. <br />d. GPS Coordinates. Prior to the [City of Pleasanton] granting final <br />certificate of occupancy or acceptance of improvements, the <br />applicant shall provide GPS coordinates for all installed stormwater <br />treatment facilities, hydromodification management measures, and <br />trash capture devices. The coordinates shall be in a format <br />determined in one of two formats: <br />i. GIS layer (shape file or feature class in a geodatabase): At <br />minimum, provide a GIS point layer of the facility inlet, and <br />the GIS polygon layer of facility footprint. Layer(s) shall <br />contain the device type, manufacturer, model, and date it was <br />installed, and area draining to the device. <br />ii. Excel file (csv or text file) with the information noted above, in <br />addition to a coordinate location pair of Latitude/Longitude or <br />X/Y Coordinates in North American Datum (NAD) 1983 State <br />Plane California III FIPS 0403 Feet, WKID: 2227, Authority: <br />EPSG. <br />E. Hydromodification management measures. <br />1. Regulated Projects that are designated as Hydromodification <br />Management projects under the MRP shall demonstrate that the project <br />will not cause an increase in stormwater runoff flow rates, volume, or flow <br />durations over the pre-project existing condition based on the design <br />Page 218 of 248