My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 6 - Project Plans
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 6 - Project Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:42:45 AM
Creation date
7/8/2024 11:02:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised July 2022 Page 4 of 10 <br />Energy <br />Energy Efficiency <br />CAP 2.0 <br />(S2) <br />Additions and <br />Renovations <br />6.Energy Efficiency Upgrades.Will the Project install <br />energy efficient window upgrades, LED lighting, and <br />other efficiency upgrades. Rebates and financing may be <br />available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Renewable Energy <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />7.Solar.Will the Project include installation of a solar PV <br />system at time of new construction that meets the power <br />needs of the new building? Indicate the plan sheet(s) <br />where solar information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4) <br />Covered <br />Projects <br />8.Energy Storage System.When solar is being <br />installed, will the Project include a battery storage back- <br />up system? Indicate the plan sheet(s) where battery <br />storage information is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P4)All Projects <br />9.Water Heater.If a new water heater is being installed, <br />will the Project include installation of a solar water <br />heater? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br />Project intends to utilize energy efficient fixtures <br />Garage have been designed to allow for <br />battery storage installation. <br />Solar water heating is not <br />being proposed.
The URL can be used to link to this page
Your browser does not support the video tag.