My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 6 - Project Plans
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 6 - Project Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:42:45 AM
Creation date
7/8/2024 11:02:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised July 2022 Page 5 of 10 <br />Building Electrification <br />CAP 2.0 <br />(P1) <br />New <br />Construction <br />10.All-Electric.Will the Project be all-electric (i.e., does <br />not include any new gas infrastructure), including <br />lighting, heating, cooking, and water heating? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(P2) <br />Additions and <br />Renovations <br />11.All-Electric Existing Buildings.Will the Project <br />upgrade existing residential and commercial buildings to <br />be all-electric (e.g., air source heat pumps, heat pump <br />water heaters, electric dryers, and induction stoves)? <br />Rebates may be available.Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />CAP 2.0 <br />(S1)All Projects <br />12.Refrigerant Management.If new heating, <br />ventilation, and air conditioning (HVAC) systems are <br />being installed, does the project incorporate the lowest <br />global warming potential (GWP) refrigerants for HVAC <br />systems?Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br />Project will comply with requirements at time <br />of building permit issuance. Due to <br />age-qualified gas cooking is preferred. <br />N/A <br />Project will utilize appropriate equipment <br />to achieve Title 24 requirements at <br />time of permit submittal.
The URL can be used to link to this page
Your browser does not support the video tag.