Laserfiche WebLink
Revised July 2022 Page 6 of 10 <br />Vehicle Electrification <br />CAP 2.0 <br />(P5) <br />New <br />Construction <br />13.EV Charging.Will the Project install electric vehicle <br />charging infrastructure as follows: <br />SFR: One Level 2 EV Ready <br />2 space and one <br />Level 1 EV Ready per unit. <br />ADU: One Level 1 EV Ready space per unit <br />(where parking is provided). <br />Multi-family: 15-percent of dwelling units shall <br />provide one Level 2 EVCS <br />3 space, and 85-percent <br />of dwelling units shall provide one Level 2 EV <br />Ready4. <br />Offices: 20-percent of required parking spaces <br />shall be Level 2 EVCS, and 30-percent shall be <br />Level 2 EV Capable5. <br />All other non-residential: 10-percent of parking <br />spaces shall be Level 2 EVCS, and 10-percent <br />shall be Level 2 EV Capable. <br />Indicate the plan sheet(s) where EV Charging <br />information is provided. <br />Yes܆ <br />No܆ <br />N/A܆ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br /> <br />2 EV Ready includes: Installation of raceway, adequate panel capacity, dedicated branch circuit, circuit breaker, and electrical components (e.g., 240-volt outlet). Level 2 must be capable of 8.3 kVa (208/240 volt, 40 amp), <br />Low Level 2 must be capable of 4.1 kVA (208/240 volt, 20 amp), and Level 1 must a minimum of 2.2 kVa (110/120 volt, 20-amp). <br />3 EVCS includes: Installation of raceway, adequate panel capacity, dedicated branch circuit, circuit breaker, and electrical components (e.g., 240-volt outlet). and vehicle supply equipment. <br />4 Five Level 2 and/or Level 1 spaces can be substituted for each direct current fast charging (DCFC) station provided (i.e., a DCFC is a minimum of 48 kVA- 480 volt, 100-amp). <br />5 EV Capable includes: Conduit installed and adequate panel capacity installed to accommodate future installation of a dedicated circuit and charging station. <br />EV ready pre-wiring is currently proposed.