My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 6 - Project Plans
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 6 - Project Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:42:45 AM
Creation date
7/8/2024 11:02:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised July 2022 Page 9 of 10 <br />Green Materials <br />CAP 2.0 <br />(S6)All Projects <br />21.Embodied Carbon.Will the Project include low <br />carbon building materials (e.g., recycled concrete and <br />metals) as part of construction?Voluntary <br />Yes܆ <br />No܆ <br />N/A܆ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Water <br />Water Use Efficiency <br />CAP 2.0 <br />(P15)All Projects <br />22.Water Conservation.Will the Project incorporate <br />water-efficiency measures, including efficient water <br />fixtures and climate adapted plantings? Rebates may be <br />available. Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Municipal <br />Code (17.14) <br />and State <br />WELO <br />All Projects <br />23.Water Efficient Landscape.If the project includes <br />new landscape areas of greater than 500 square-feet or <br />rehabilitated landscape areas of greater than 2,500 <br />square-feet, will the Project comply with Municipal Code <br />Chapter 17.14 and implement the City’s Water Efficient <br />Landscape Ordinance (WELO)? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Water Recycling <br />CAP 2.0 <br />(S8)All Projects <br />24.Green Stormwater Infrastructure.Will the Project <br />incorporate green roofs, rainwater catchment, permeable <br />pavement, bioretention areas, and/or other green <br />stormwater infrastructure? Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />The use of recycled materials <br />in construction has not been <br />determined at this time. <br />Project will comply with WELO <br />standards per the landscape designs. <br />Project will comply with adopted <br />laws and regulations at the time <br />of building permit submittal. <br />Bioretention basin is proposed for project, <br />see Civil plans.
The URL can be used to link to this page
Your browser does not support the video tag.