Laserfiche WebLink
Revised July 2022 Page 10 of 10 <br />SF Bay <br />Region <br />Requirements <br />All Projects <br />25.Stormwater Management. For projects creating <br />and/or replacing more than 2,500 square-feet of <br />impervious surface, will the Project incorporate on-site <br />stormwater management consistent with the NPDES <br />permit and City stormwater management requirements? <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Overall Sustainability <br />Urban Forest <br />CAP 2.0 <br />(P13)All Projects <br />26.Tree Planting.If planting is proposed, will the Project <br />include climate-adapted plantings?If trees are removed, <br />will the Project include replacement climate-adapted <br />trees? Indicate the plan sheet(s) where tree information <br />is provided. <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br />Wildfire Prevention <br />CAP 2.0 <br />(S9)All Projects <br />27.Wildfire Prevention and Preparation.Will the <br />Project incorporate a wildfire-defensible space,fire <br />hardening retrofits, and commit to fire prevention through <br />site maintenance (e.g., regularly cleaning out rain <br />gutters) and preparation?Voluntary <br />Yes☐ <br />No☐ <br />N/A☐ <br />_____________________ <br />_____________________ <br />_____________________ <br />_____________________ <br /> <br />Project will comply with the <br />NPDES permit and City stormwater <br />requirements. See Civil plans. <br />Project will provide native <br />climate-adjusted plantings. <br />Project will be Type VB <br />construction.