My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 6 - Project Plans
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 6 - Project Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:42:45 AM
Creation date
7/8/2024 11:02:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 21, 2022 <br /> Job No. 4031.101 <br /> Page 6 <br /> <br />BERLOGAR STEVENS & ASSOCIATES <br /> FILL SLOPES <br /> <br />Proposed fill slopes are less than10 feet in height. Fill slopes less than 10 feet tall may be <br />constructed at a 2H:1V gradient. Fill slopes that are greater than 10 feet in height should be <br />constructed at 3H:1V gradient. <br /> <br /> SITE PREPARATION AND GRADING <br /> <br />Our general site preparation and grading recommendations are as follows: <br /> <br />1. Existing structures, abandoned utilities, and buried structures should be demolished and <br />removed from the site. <br /> <br />2. The surficial soil should be stripped and may be used as non-structural fill in landscaping areas. <br />The amount of stripping will be evaluated just before grading commences. <br /> <br />3. Where undocumented fill is encountered (area of southwestern knob), it should be <br />overexcavated to expose firm native soils or bedrock. <br /> <br />4. Tree root balls and all roots larger than 2 inches in diameter should be removed. <br />5. The area of the orchard should be overexcavated a minimum of 2 feet. The bottom of the <br />overexcavation should be scarified at least 12 inches, moisture conditioned and compacted. <br />6. Areas to receive fill outside of the orchard area should be scarified at least 12 inches, moisture <br />conditioned and compacted in accordance with the requirements below. <br />7. Engineered fill should be properly moisture conditioned and compacted in accordance with <br />requirements below. <br /> <br />a. Expansive soils (PI more than 20) should be brought to a moisture content of at least 7 <br />percent above the optimum moisture content and compacted to between 84 and 88 <br />percent relative compaction. <br /> <br />b. Soils with low expansion potential (PI of 20 or less) should be moisture conditioned to <br />at least 5 percent above the optimum moisture content and compacted to at least 90 <br />percent relative compaction. <br /> <br />8. Relative compaction refers to the in-place dry density of soil expressed as a percentage of <br />the maximum dry density determined by ASTM D1557 compaction test procedure. <br />Optimum moisture is the water content (percentage by dry weight) corresponding to the <br />maximum dry density.
The URL can be used to link to this page
Your browser does not support the video tag.