My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />118 <br />not expected to result in the transport, use, storage, or disposal of substantial <br />amounts of hazardous materials, with the exception of common residential <br />and commercial-grade hazardous materials such as household cleaners and <br />paint, among others. <br />Several documented release sites are within 0.5 mile of the rezoned housing <br />sites. (See Housing Element Update Draft EIR Table 3.8-1 and Exhibits 3.8-1a <br />and 3.8-1b.) In addition, it is noted that Site 22 (Merritt) is a currently inactive <br />California Department of Toxic Substances Control (DTSC) site but needs <br />further evaluation regarding previously detected VOCs and organochlorine <br />pesticides in soil and groundwater.18 Construction activities at these sites <br />would likely involve ground-disturbing activities that could expose workers, <br />the public, and the environment to contaminated soil and groundwater, if <br />present. <br />The Housing Element Update FEIR concluded that compliance with <br />applicable federal, State, and local laws, plans, and regulations, including <br />the General Plan, Titles 8 and 17 of the California Code of Regulations, <br />California Occupational Health and Safety Administration (Cal/OSHA) <br />requirements, as well as implementation of MM HAZ-2, which requires the <br />preparation of a Phase I Environmental Site Assessment (Phase I ESA) and <br />Phase II ESA (as necessary) and completion of any necessary remedial <br />activities to be conducted under the oversight of the appropriate regulatory <br />agency, would provide public protection from hazards associated with the <br />use, transport, treatment, and disposal of hazardous substances during <br />construction and operation of development consistent with the Housing <br />Element Update. Therefore, impacts related to upset and accident <br />conditions involving the release of hazardous materials into the environment <br />would be less than significant with mitigation. <br />Proposed Project Analysis and Conclusion <br />The Housing Element Update FEIR identified that the project site was in need <br />of further evaluation regarding previously detected VOCs and <br />organochlorine pesticides in soil and. The RWQCB closed the project site in <br />2003 based on the available data. Additional sampling was conducted in <br />2007 by Cornerstone to evaluate the data with respect to current Water <br />Board Environmental Screening Levels (ESLs). <br /> <br />18 California Department of Toxic Substances Control (DTSC). 2022. Response to Notice of Preparation of a Draft <br />Environmental Impact Report for the City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />Program – Dated April 2022 (State Clearinghouse Number: 2022040091). May 5.
The URL can be used to link to this page
Your browser does not support the video tag.