My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 161 <br />Environmental Issue <br />Area <br />Housing <br />Element <br />Update FEIR <br />Determination <br />Effect Peculiar <br />to Project or <br />Site? <br />New Significant <br />Effect? <br />New <br />Significant Off- <br />site, <br />Cumulative <br />Impact? <br />New <br />Information, <br />More Severe <br />Adverse <br />Impact? <br />XV. Public Services <br />Would the project result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, need for new or physically <br />altered governmental facilities, the construction of which could cause significant <br />environmental impacts, in order to maintain acceptable service ratios, response times <br />or other performance objectives for any of the public services: <br />a) Fire protection? Less than <br />significant <br />impact <br />No No No No <br />b) Police protection? Less than <br />significant <br />impact <br />No No No No <br />c) Schools? Less than <br />significant <br />impact <br />No No No No <br />d) Libraries? Less than <br />significant <br />impact <br />No No No No <br />e) Other public <br />facilities? <br />Less than <br />significant <br />impact <br />No No No No <br /> <br />a) Need for New or Altered Fire Protection Facilities <br />Would the project: Result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, need <br />for new or physically altered governmental facilities, the <br />construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response <br />times or other performance objectives for fire protection? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that development consistent <br />with the Housing Element Update could result in an increased demand for <br />fire protection services, and, as this demand increases, there may be a need <br />to increase staffing and equipment to maintain acceptable service ratios, <br />reflex times, and other performance standards. This would require existing fire <br />stations to be able to accommodate the additional staff and/or equipment. <br />If an existing fire station is at capacity for staffing, this could require an <br />expansion of an existing fire station or construction of a new fire station, the
The URL can be used to link to this page
Your browser does not support the video tag.