Laserfiche WebLink
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 189 <br />collection and treatment and no new or expanded wastewater treatment <br />facilities would be needed, and impacts would be less than significant. <br />Stormwater Drainage Capacity <br />The Housing Element Update FEIR indicated that development projects <br />creating or replacing over 2,500 square feet of impervious surface would <br />require satisfaction of the City’s Stormwater Requirements Checklist, which <br />would ensure the implementation of regulated stormwater infrastructure. The <br />General Plan Chapter 8, Water Element, includes requirements for <br />stormwater facilities. Goal 6 requires projects to minimize stormwater runoff <br />and provide adequate stormwater facilities to protect property from <br />flooding. Policy 8 ensures an adequate storm drainage system to serve <br />existing and future development. Specifically, Program 8.4 requires the <br />installation of on-site storm drainage infrastructure that would improve local <br />storm drainage systems to accept appropriate design-year flows, as <br />determined by the City Engineer. Additional policies require reduction of <br />stormwater runoff and maximizing infiltration of naturally occurring rainwater <br />to improve surface and subsurface water quality, minimize impervious <br />surfaces, and implement stormwater runoff requirements. In addition, <br />development consistent with the Housing Element Update would be required <br />to pay a fair share of the City’s storm drainage improvement costs. <br />Compliance with City requirements and policies would ensure that runoff <br />would not inundate downstream storm drainage facilities such that new or <br />expanded facilities would be required. Therefore, the Housing Element <br />Update FEIR concluded impacts would be less than significant. <br />Electric Power, Natural Gas, and Telecommunications <br />The Housing Element Update FEIR indicated that future development <br />consistent with the Housing Element Update would be located within the <br />urban framework of the City and near existing infrastructure. The CAP 2.0 <br />includes strategies that would reduce the electricity and natural gas <br />consumption for development projects consistent with the Housing Element <br />Update. Because implementation of the Housing Element Update would not <br />result in unplanned growth. As such, the utility providers take into <br />consideration all future growth projections in their planning efforts, and <br />development consistent with the Housing Element Update would not be <br />expected to require or result in new or expanded electricity, natural gas, or <br />telecommunications facilities beyond those already planned. Necessary <br />extensions and/or upgrades would generally occur within existing utility <br />easements.