My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />190 <br />In summary, the Housing Element Update FEIR concluded that development <br />consistent with the Housing Element Update would not require or result in the <br />relocation or construction of new or expanded water, wastewater treatment <br />or stormwater drainage, electric power, natural gas, or telecommunications <br />facilities, the construction or relocation of which could cause significant <br />environmental effects. Impacts would be less than significant. <br />Wastewater Treatment Capacity <br />The Housing Element Update FEIR indicated that the 2.17 million gallons per <br />day (mgd) of wastewater generated by new development consistent with <br />the Housing Element Update would represent less than 5 percent of total <br />treatment capacity of the RWTF and LWRP, and the RWTF and LWRP would <br />have the capacity to handle the increase in wastewater. <br />The City has entered into numerous sewage reservation agreements that <br />guarantee capacity to various properties/projects. Most approved, but not <br />yet constructed, commercial/office development utilize capacity the City <br />has “reserved” for them out of its original sewage treatment plant and <br />wastewater discharge capacities. Because the City has secured both <br />treatment plant and export capacity by agreement with the DSRSD and its <br />participation in the Livermore-Amador Valley Water Management Agency <br />(LAVWMA) Expansion Project, sewage treatment and disposal capacity <br />would not be a constraint in the short- or mid-term. Therefore, the City has <br />secured capacity for its continued existing and future wastewater flows. In <br />addition, the City’s capacity in the discharge pipeline would allow growth in <br />dry-weather flows as well as accommodate its wet-weather flows for many <br />future years.31,32 <br />Development consistent with the Housing Element Update would be required <br />to comply with the policies and actions of the General Plan regarding <br />wastewater. New development would also be subject to the latest adopted <br />edition of the California Plumbing Code and CALGreen Code including the <br />provisions for water efficient fixtures and toilets. All new development is <br />required to pay its fair share of the City’s planned sewer system <br />improvements including treatment, distribution, reuse, and export facilities. <br />The Sanitary Sewer Master Plan is audited bi-annually and updated every 5 <br />years. These updates allow for the consideration of development and <br /> <br />31 City of Pleasanton. 2019. Sewer System Management Plan. December. <br />32 City of Pleasanton. 2009. Pleasanton General Plan 2005-2025. Section 9—Water Element. July.
The URL can be used to link to this page
Your browser does not support the video tag.