Laserfiche WebLink
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />52 <br />The proposed project would not result in a new or more severe adverse <br />impact that was not previously identified in the Housing Element Update FEIR. <br />Conclusion <br />With regards to Air Quality, the Consistency Checklist demonstrates that: <br />1. No peculiar impacts related to the proposed project or its site that were <br />not analyzed as significant effects in the Housing Element Update FEIR <br />have been identified. <br />2. There are no potentially significant off-site and/or cumulative impacts <br />which were not analyzed in the Housing Element Update FEIR. <br />3. No substantial new information has been identified which results in an <br />impact which is more severe than anticipated by the Housing Element <br />Update FEIR. <br />4. MM AIR-1a and MM AIR-1b from the Housing Element Update FEIR <br />would be required and would reduce potential impacts to less than <br />significant, which is consistent with the conclusions in the Housing <br />Element Update FEIR. <br /> <br />Mitigation Measures <br />Housing Element Update FEIR Mitigation Measures <br />MM AIR-1a Prior to the issuance of a grading or building permit, whichever is <br />sooner, the project applicant for a potential site for rezoning shall <br />submit an air quality construction plan detailing the proposed air <br />quality construction measures related to the project such as <br />construction phasing, construction equipment, and dust control <br />measures, and such plan shall be approved by the Director of <br />Community Development or designee. Air quality construction <br />measures shall include (1) Basic Construction Mitigation <br />Measures, as approved by the Bay Area Air Quality <br />Management District (BAAQMD) in 2017, or the then currently <br />adopted guidelines and, (2) where construction-related <br />emissions would exceed the applicable thresholds as <br />demonstrated by a qualified consultant documented pursuant <br />to methodologies considered acceptable at that time, <br />Additional Construction Mitigation Measures, as recommended <br />by the BAAQMD, shall be implemented to reduce emissions to <br />acceptable levels. The air quality construction plan shall be