Page 1 of 4 <br />Item #13 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />May 7, 2024 <br />Public Works - Engineering Division <br /> <br />TITLE: APPROVE PLANS AND SPECIFICATIONS AND AWARD A CONSTRUCTION <br />CONTRACT TO AMERICAN ASPHALT REPAIR & RESURFACING COMPANY, <br />INC. IN THE AMOUNT OF $374,391 AND AN APPROXIMATELY 10 PERCENT <br />CONTINGENCY OF $37,439 FOR THE ANNUAL SLURRY SEALING OF <br />VARIOUS STREETS PROJECT, CIP NO. 24504 <br /> <br />SUMMARY <br />This project applies slurry seal on 560,000 square feet of existing pavement to prolong the <br />useful life of the existing street infrastructure while providing a safe and smooth riding <br />condition. Slurry seal is an application of a thin coat of asphalt/aggregate slurry mixture that <br />seals the road surface. <br /> <br />Bids were received on April 3, 2024, and staff recommends awarding the construction contract <br />to the lowest responsible bidder, American Asphalt Repair & Resurfacing Company, Inc., in the <br />amount of $374,391 and an approximately 10 percent contingency of $37,439 for the Annual <br />Slurry Sealing of Various Streets Project, CIP No. 24504. <br /> <br />RECOMMENDATION <br />1. Approve plans and specifications and award a construction contract for the project to <br />American Asphalt Repair & Resurfacing Co., inc., of Hayward, CA, for the low bid <br />amount of $374,391. <br />2. Authorize the City Manager to enter into the project contract. <br />3. Authorize the Director of Public Works, or authorized staff, to approve and execute <br />contract change orders for a project contingency amount of $37,439 (approximately 10 <br />percent of the contract) for unforeseen yet necessary related work. <br /> <br /> <br />BACKGROUND <br />The City has two annual projects designed to maintain roadway infrastructure: the Annual <br />Street Resurfacing and Preventative Maintenance Project and the Annual Slurry Seal of <br />Various Streets Project. The first project resurfaces various roadways by overlaying the <br />existing pavement with a new layer of asphalt concrete, while the other project slurry seals a <br />different set of roadways. The resurfacing project is considered a street reconstruction project, <br />while the slurry project is a preventative maintenance project. Together, these projects are <br />designed to maintain the City’s roadway pavement condition. <br /> <br />Slurry seal is placed on streets that are in good condition to seal the street before surface <br />deterioration occurs, which would allow water to penetrate the roadbed and lead to premature <br />roadway failure. Slurry seal treatments are expected to last six to eight years, depending on <br />the amount of traffic on the street. Slurry seal costs approximately one-fifth of the cost of <br />Page 202 of 448Page 211 of 557