Page 2 of 7 <br />On November 7, 2023, the City Council approved water rate increases to fund immediate/near- <br />term essential system upgrades; fund plans for water supply alternative project design work; <br />pay for additional purchase of water from Zone 7 over the next 2-3 years; augment staffing to <br />manage, plan, and implement solutions for the water distribution system; and replenish the <br />reserve fund and restore the water fund’s financial position. The City Council adopted a <br />resolution on March 5, 2024, that declared its intent to reimburse itself with proceeds <br />from future debt. On April 16, 2024, the City Council approved a resolution to prepay the 2017 <br />Water Revenue Bonds prior to their maturity on 2/1/2025 to meet the debt service coverage <br />requirements to issue additional debt. <br /> <br />DISCUSSION <br />PROJECT OVERVIEW <br />The debt proceeds will be used to fund the projects described below. A detailed report was <br />presented to the City Council on March 19, 2024, regarding the near-term improvement <br />projects and the design work associated with the Water Supply Alternative/City Ground Water <br />Supply Project. <br /> <br />The hydraulic analysis conducted for the City’s water system identified several core system <br />deficiencies, including turnout capacities and pipelines, to meet the current and future growth <br />of the system. The loss of regular use of the City’s wells due to per- and polyfluorinated <br />substances (PFAS) created further deficiencies in the City’s system as the wells no longer <br />provide water at key locations within the City’s distribution system. The Water Supply <br />Alternatives (WSA) analysis was completed to determine the best solution to address the <br />PFAS issue, and the hydraulic model was utilized to identify the necessary distribution <br />improvements for the various water supply alternatives. Several sections of pipelines were <br />identified as needing upgrades in all the various alternatives which also aligned with the core <br />system deficiencies. <br /> <br />The model was requested to identify the essential improvements that need to be constructed <br />to meet the forecasted system demands until the selected WSA can be put in service (an <br />assumed date of late 2028). The results identified three segments of the pipeline (Bernal <br />Avenue, Stoneridge Drive, and Sunol Boulevard), and improvements at Turnout No. 1 and No. <br />4 need to be completed and were termed “Near-Term Water Improvements.” Further identified <br />were emergency projects completed to meet the anticipated summer demands of 2024, <br />including temporary repairs to Turnout No. 1 to return it to service and installing a temporary <br />rental pump at Turnout No. 4 to increase the capacity of the turnout. <br /> <br />A condition assessment was completed on the water system and is currently being utilized in <br />the prioritization process in the development of the 10-Year Water CIP. The condition <br />assessment identified that water lines on Stoneridge Drive and Sunol Boulevard were near the <br />end of their useful life. The water lines on Stoneridge Drive and Sunol Blvd will be upsized to <br />accommodate the future removal of the older lines. <br /> <br />The Near-Term Water Improvements were broken into three bid packages to expedite the <br />work. <br /> <br />Bernal Avenue Water Line & Turnout No. 1 - IN PROGRESS <br />The first project is the Bernal Avenue 18-Inch Potable Water Main (F- 4 Line) & Turnout No. 1 <br />Project, CIP 24172, which was awarded for construction on January 16, 2024, for $2.2 million. <br />Page 211 of 448Page 220 of 557