My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Description <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 13 <br />Green Building Features <br />The proposed project would include several sustainability features to help reduce greenhouse gas <br />(GHG) emissions and meet City-wide sustainability goals. The project would comply with the 2022 <br />California Green Building Standards Code (CALGreen) as well as PMC Chapter 17.50, Green Building. <br />The project would be Leadership in Energy and Environmental Design (LEED) silver certified. <br />Pursuant to PMC Section 20.26.370, Section 5.106.13 added—All-electric buildings, the proposed <br />residences would be all-electric and would have no natural gas or propane plumbing installed. <br />Electricity would be the sole source of energy for space and water heating. The residential portion <br />of the proposed project would include a photovoltaic solar array on the roof of all houses pursuant <br />to the California Energy Code. The proposed commercial buildings would use natural gas. Heating, <br />ventilating, and air conditioning system (HVAC) systems to be installed as part of the project would <br />incorporate the lowest global warming potential refrigerants. The project would provide adequate <br />recycling, compost, and landfill containers to meet Senate Bill 1383 and comply with PMC Chapter <br />9.20, Garbage. The project would incorporate water-efficiency measures, including efficient water <br />fixtures and climate adapted plantings. <br />Construction <br />Construction would commence towards the end of 2024 or early 2025, which is within the DSP’s <br />planning horizon of 2040. Overall construction of the Barone’s project would take approximately 26 <br />months, including demolition, site preparation, grading, building construction, paving, and <br />architectural coating. Construction would occur on all days, except for Sundays and holidays from <br />approximately 8 a.m. to 8 p.m. (within PMC regulations). All structures on the project site would be <br />demolished, except for the single-family residence, resulting in a total of 1,877 square feet of <br />demolished buildings. Grading would likely result in approximately 4,200 cubic yards of material <br />being exported from the site, and material would be hauled to the Pleasanton Landfill at 3110 Busch <br />Road. All construction equipment would be staged onsite and several pieces of equipment would <br />include the use of only Tier 3 and Tier 4 engines, as detailed in Section 5.2, Air Quality. The project <br />would comply with PMC Chapter 9.21, Construction and Demolition Debris, and achieve recycling or <br />reuse of at least 90 percent of Portland cement concrete and asphalt concrete and at least 75 <br />percent of the remaining construction and demolition debris. <br />Required Approvals <br />Prior to development the following discretionary approvals from the City would be required: <br /> PUD Mixed-Use application to rezone the two parcels from C-C to PUD-MU <br /> Building Permit for addition and ADU on existing residential property <br />Furthermore, while not anticipated, if the project were to result in alterations to the riparian <br />corridor of Arroyo del Valle or discharge of stormwater into Arroyo del Valle, Waste Discharge <br />Requirements from the San Francisco Bay Regional Water Quality Control Board (SFBRWQCB) and a <br />Lake or Streambed Alteration (LSA) Agreement from the California Department of Fish and Wildlife <br />(CDFW) may be required. It is not expected that the project would result in the discharge of dredged <br />or fill materials into Arroyo del Valle; accordingly, a Clean Water Act Section 404 permit from the <br />U.S. Army Corps of Engineers is not anticipated to be required.
The URL can be used to link to this page
Your browser does not support the video tag.