Laserfiche WebLink
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 19 <br />Overall, the proposed project would have a less than significant impact to aesthetics, similar to the <br />Final EIR for the DSP. <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to aesthetics, and no new <br />mitigation measures are necessary. <br />Conclusion <br />Impacts would be less than significant, similar to those identified in the Final EIR, and no significant <br />new or substantially increased aesthetics impacts would occur compared to those discussed in the <br />Final EIR. <br />5.2 Air Quality <br />Impacts Identified in the Certified Final EIR <br />The Final EIR determined that implementation of the DSP would not conflict with or obstruct <br />implementation of the applicable air quality plan, the Bay Area Air Quality Management District’s <br />(BAAQMD) 2017 Clean Air Plan. The analysis therein demonstrated the DSP would support the <br />primary goals of the Clean Air Plan, would include applicable control measures from the Clean Air <br />Plan, and would not hinder implementation of any control measures. Impacts would be less than <br />significant. <br />The Final EIR determined that development facilitated by the DSP would violate air quality <br />standards, contribute substantially to existing or projected air quality violations, and would result in <br />a cumulatively considerable net increase in criteria pollutants for which the region is in <br />nonattainment. The DSP would involve implementation of Mitigation Measure AQ-1, which would <br />require development projects facilitated by the DSP to prepare a technical assessment that <br />evaluates construction-related air quality impacts, and Mitigation Measure AQ-2, which would <br />require development projects facilitated by the DSP to prepare a technical assessment that <br />evaluates operation-related air quality impacts. However, even with implementation of these <br />mitigation measures, development facilitated by the DSP would generate ozone and particulate <br />matter, criteria pollutants for which the region is in nonattainment. Impacts would be significant <br />and unavoidable. <br />Impacts of the Barone’s Project <br />In accordance with Mitigation Measures AQ-1 and AQ-2 of the DSP, a technical assessment of the <br />project’s construction and operational air quality impacts is provided below. <br />Air Quality Standards <br />CONSTRUCTION EMISSIONS <br />Construction associated with the Barone’s project would generate short term emissions of criteria <br />air pollutants. The criteria air pollutants of primary concern within the project area include ozone <br />(O3) precursor pollutants (i.e., reactive organic gases [ROG] and nitric oxide [NOx]) and particulate <br />matter with diameter 10 microns or less and 2.5 microns or less (PM10 and PM2.5). Construction <br />generated emissions are of temporary duration, lasting only as long as construction activities occur,