My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />26 <br />LD-P.66. Conservation of the Arroyo del Valle. Require developers of future projects involving <br />land within and adjacent to the Arroyo del Valle to implement the following measures to <br />minimize potentially negative impacts to the Arroyo: <br /> Coordinate with the appropriate environmental regulatory agencies and secure all required <br />construction and grading permits. <br /> Conduct an assessment of existing conditions, including topography, waterline location, <br />trees, and other major natural site features. <br /> Identify the existing plant and wildlife communities and species. <br /> Prepare detailed channel/habitat restoration and enhancement plans for project impact <br />areas that retain or enhance existing channel hydraulic capacity. <br /> Prepare wildlife and habitat monitoring programs to ensure the long-term success of <br />channel/habitat restoration and enhancement plans. <br />The proposed project would be required to comply with the provisions of construction and grading <br />permits, as outlined in the policy above. Although it is not anticipated that the project would require <br />ground disturbance within the riparian corridor of Arroyo del Valle, the project applicant would be <br />required to prepare a channel/habitat restoration and enhancement plan if Arroyo del Valle or its <br />riparian habitat are impacted by construction ground disturbance or stormwater discharge. <br />Additionally, state and federal wetland and waters protections such as Clean Water Act, Porter- <br />Cologne Water Quality Control Act, and California Fish and Game Code would also apply, and the <br />appropriate authorizations would be required to be secured prior to construction in coordination <br />with the environmental regulatory agencies. Further, as described further in Section 4.9, Hydrology <br />and Water Quality, the project would disturb more than one acre of land and the project applicant <br />would be required to prepare a Stormwater Pollution Prevention Plan (SWPPP) pursuant to the <br />National Pollutant Discharge Elimination System (NPDES) General Permit (Permit No. CAS612008). <br />As described therein, compliance with state regulations would avoid and minimize erosion and <br />contamination to the extent feasible by requiring erosion and sediment controls and runoff water <br />quality monitoring. <br />In operation, the proposed project would result in a net decrease in impervious surfaces compared <br />to existing conditions, which would not generate additional stormwater runoff. Additionally, the <br />project would involve irrigation of landscaped areas. Stormwater and irrigation water runoff into <br />Arroyo del Valle could have an adverse effect on special status species, sensitive natural <br />communities, and state and federally protected wetlands/waters. However, stormwater and <br />irrigation water from the project site would be collected and directed to onsite bioretention areas <br />and silva cells, and no water would be directly released into Arroyo del Valle. This project feature is <br />consistent with Chapter 9.14, Stormwater Management and Discharge Control of the PMC; <br />additionally, the project would be subject to the following DSP policy: <br />LD-P.67. Best Management Practices. Require developers and business owners to operate <br />projects to minimize impacts to the Arroyo. <br /> Require the owners of new businesses that locate adjacent to the Arroyo to implement <br />strategies to avoid trash and other waste from entering the Arroyo, including, covering trash <br />cans so that wildlife cannot access them; properly disposing of food waste; and prohibiting <br />dumping.
The URL can be used to link to this page
Your browser does not support the video tag.