Laserfiche WebLink
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 45 <br />5.8 Hydrology, Drainage, and Water Quality <br />Impacts Identified in the Certified Final EIR <br />The Final EIR concluded that the DSP would not violate water quality standards or waste discharge <br />requirements as development facilitated by the DSP would be required to comply with the region’s <br />NPDES permit, which includes preparation of a stormwater pollution prevention plan (SWPPP) if <br />applicable, and would also be required to comply with stormwater and erosion control standards <br />outlined in the PMC. Impacts would be less than significant. <br />The Final EIR includes an analysis of groundwater supply and determined that development <br />facilitated by the DSP would draw have a groundwater demand of 21 acre-feet per year (AFY), which <br />represents 0.6 percent of the City’s reasonably available volume of groundwater. Additionally, the <br />Final EIR determined that because the DSP area is already largely built out, development and <br />redevelopment facilitated by the DSP would not increase the total impervious surface area of the <br />DSP area and would not substantially interfere with groundwater recharge. Development would be <br />required to comply with several regional and local programs pertaining to stormwater runoff and <br />groundwater recharge, including the Alameda Countywide C.3 Stormwater Technical Guidance, the <br />Municipal Regional NPDES Permit, the Construction General Permit, and Statewide General Waste <br />Discharge Requirements for sanitary sewer flows. With compliance with existing federal, state, and <br />local programs, the Final EIR concludes that the DSP would not result in substantial decreases in <br />groundwater supply or substantial interference with groundwater recharge and impacts would be <br />less than significant. <br />Because the DSP area is already largely built out, the Final EIR determined that development <br />facilitated by the DSP would not substantially alter the drainage pattern of the DSP area, including <br />through the alteration of a stream or river. Individual projects would be required to develop and <br />implement a SWPPP with erosion, stormwater control, and sediment control BMPs as required by <br />the Construction General Permit to manage erosion, siltation, and flooding impacts during <br />construction, in operation. If projects facilitated by the DSP result in a net increase in impervious <br />area or are larger than one acre, they would be required to implement hydromodification <br />management BMPs. The Final EIR concludes that compliance with state, regional, and local <br />programs and regulations, development facilitated by the DSP would not result in substantial <br />alterations to the existing drainage pattern of the DSP area and would not result in substantial <br />erosion, siltation, or flooding. Impacts would be less than significant. <br />The Final EIR determined that development facilitated by the DSP would not substantially degrade <br />water quality. Existing local ordinances in the PMC and DSP policies would minimize and control <br />sources of water pollutants, and impacts related to substantial degradation of water quality would <br />be less than significant. <br />The Final EIR concludes that because only a small portion of the DSP area is within a designated <br />flood zone (areas adjacent to Arroyo del Valle), development facilitated by the DSP would not <br />impede or redirect flood flows. Further, Policies LD-P.61, LD-P.62, and LD-P.63 would ensure <br />conservation of the Arroyo Del Valle through design and best management practices. PMC Section <br />9.14.090 prohibits development within 20 feet of the top of a watercourse bank without a permit, <br />which would minimize risks associated with flood hazards and redirection of flood flows. Similarly, <br />because the DSP area is not proximate to the ocean or a large body of water subject to seiche, <br />impacts related to inundation would be less than significant.