My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 47 <br />type and locations of stormwater treatment measures to be installed (numbered sequentially <br />for identification purposes), and sizing calculations. The Stormwater Management Plan shall be <br />subject to review and acceptance by the City Engineer, prior to the issuance of an engineering or <br />building permit, whichever occurs first. <br /> Stormwater Pollution Prevention Plan: The applicant shall submit one hard copy and one PDF <br />copy of the Stormwater Pollution Prevention Plan (SWPPP) for review and acceptance by the <br />City Engineer prior to issuance of a building or engineering permit, whichever occurs first. A <br />hard copy of the City-accepted SWPPP shall be available at the project site until all work is <br />complete and engineering and building permits have been finalized. A site specific SWPPP shall <br />be combined with proper and timely installation of the Best Management Practices, thorough <br />and frequent inspections, maintenance, and documentation. Failure to comply with the <br />reviewed construction SWPPP may result in issuance of correction notices, citations, or a stop <br />work order. <br /> Excess Soil And Soil Stockpiling: All excess soil from the site shall be off-hauled from the site <br />and disposed of in a lawful manner. No temporary stockpiling of dirt on this site shall occur <br />without specific review and approval by the Director of Community Development. <br />The DSP also includes policies, listed in Section 4.3, Biological Resources, which would minimize the <br />impacts of construction on Arroyo del Valle. Compliance with existing DSP policies and state and <br />local regulations would avoid or minimize erosion and contamination to the extent feasible by <br />requiring erosion and sediment controls and runoff water quality monitoring. With compliance with <br />these existing policies and regulations, the proposed project would not result in violations to water <br />quality standards or waste discharge requirements, and would not otherwise substantially degrade <br />surface or groundwater quality. Impacts would be less than significant. <br />The Final EIR includes an analysis of groundwater supply and estimated water demand for projects <br />associated with envisioned land uses in the DSP area. The project site is currently designated for <br />Downtown Commercial use, and the project would involve changing the site’s land use to allow for <br />residential use. Although the project would involve different land uses than what originally <br />envisioned in the DSP, the project would facilitate the development of residential and commercial <br />uses, which is consistent with development envisioned by the DSP and accounted for in its water <br />supply analysis. Therefore, the water demand associated with the proposed project has been <br />accounted for in water supply estimates in the Final EIR. Additionally, the project would result in a <br />net decrease in impervious surface area within the project site, and stormwater and irrigation <br />runoff generated by the project would be collected and directed to onsite bioretention areas and <br />modular suspended pavement systems (often referred to as “Silva cells”). Stormwater would be <br />managed pursuant to Chapter 9.14, Stormwater Management and Discharge Control, of the PMC, <br />and no water would be directly released into Arroyo del Valle. Therefore, the project would not <br />substantially alter the drainage pattern of the project site. Impacts would be less than significant. <br />According to flood maps prepared by the Federal Emergency Management Agency, the portion of <br />the project site that borders Arroyo del Valle is within a Zone AE flood hazard zone, which includes <br />areas subject to a one percent annual chance of a flood (Federal Emergency Management Agency <br />2023). Arroyo del Valle is also designated as a regulatory floodway, which means that the channel of <br />the arroyo must be maintained so that flood waters may flow through the arroyo without increasing <br />the water surface elevation more than a designated height. The project would not involve <br />construction within the flood hazard zone and residences would be set back 20 feet from the top of <br />the existing bank. Therefore, the proposed project would not impede or redirect flood flows. <br />Additionally, as a primarily residential development, the project would not involve storage of
The URL can be used to link to this page
Your browser does not support the video tag.