My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />56 <br />concluded that the DSP would not result in a change to air traffic patterns and would not <br />substantially increase hazards due to design features, and impacts would be less than significant. <br />The Final EIR states that emergency accessibility is typically assessed at the project level. Because <br />the DSP includes goals and policies related to the provision of adequate emergency access and <br />because emergency accessibility would be evaluated for individual projects, the DSP would not <br />result in inadequate emergency access and impacts would be less than significant. <br />The Final EIR states that the DSP is centered on a complete-streets approach, and includes goals and <br />policies related to the performance and safety of transit, bicycle, and pedestrian facilities in the DSP <br />area. However, the bicycle facilities proposed by the DSP are inconsistent with those envisioned in <br />the City’s 2018 Bicycle and Pedestrian Master Plan, and the Final EIR includes Mitigation Measure <br />TRA-9, which would involve conducting a feasibility study for bicycle facilities in the DSP area. With <br />this mitigation measure, the DSP would not conflict with adopted policies, plans or programs <br />regarding transit, bicycle, or pedestrian facilities and impacts would be less than significant. <br />Overall, impacts to traffic and transportation would be less than significant with mitigation. <br />Impacts of the Barone’s Project <br />The proposed project would not modify or inhibit use of existing bicycle and pedestrian facilities on <br />St. John Street and in the DSP area. Therefore, the project would not conflict with the City’s Bicycle <br />and Pedestrian Master Plan. <br />As discussed above, SB 743 and the subsequent amendment of the CEQA Guidelines was not <br />incorporated into CEQA at the time the Final EIR was prepared and certified, and therefore this <br />analysis is prepared in terms of LOS. As discussed in Section 5.9, Land Use, Population, and Housing <br />of this Addendum, the project would generate a population increase of 14 housing units and up to <br />approximately 37 people, and the DSP is anticipated to facilitate an increase of 370 housing units <br />and 1,000 people. The 14 housing units and 37 people associated with the proposed project would <br />represent approximately 4 percent of the anticipated increase in housing units and population <br />associated with the DSP, and the proposed project is within the population growth projections for <br />the DSP as analyzed in the EIR. Additionally, as shown in Table 10, the proposed project would <br />generate a relatively small increase in trips over existing uses at the site, which would not <br />substantially affect the LOS of study intersections in the DSP area. Accordingly, growth associated <br />with the proposed project was captured in the Final EIR’s traffic and transportation analysis, and the <br />project would not result in greater impacts to LOS than those identified in the Final EIR.
The URL can be used to link to this page
Your browser does not support the video tag.