My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 55 <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to public facilities and <br />recreation compared with those identified in the Final EIR, and no new mitigation measures are <br />necessary. <br />Conclusion <br />Impacts would be less than significant, similar to the Final EIR, and no significant new or <br />substantially increased public facilities and recreation impacts would occur compared to those <br />identified in the Final EIR. <br />5.12 Traffic and Transportation <br />The Final EIR was prepared and certified prior to adoption of the final CEQA guidelines that would <br />change the metric of transportation analyses under CEQA from level of service (LOS) to vehicle miles <br />traveled (VMT). LOS, a measure of traffic congestion, was replaced as the metric of transportation <br />analyses by VMT pursuant to Senate Bill 743. While a preliminary assessment of VMT generated by <br />the DSP was prepared, it was included in the Final EIR (Section 3.12, Traffic and Transportation) for <br />informational purposes only. <br />Changes in regulations after approval of the original EIR do not constitute new information <br />triggering a supplemental or subsequent EIR (Concerned Dublin Citizens v. City of Dublin [2013] 214 <br />Cal.App.4th 1301, 1320). Nor does it require a previously analyzed topics, such as the change from <br />the LOS standard to the VMT standard for traffic, to be reassessed under the new requirements <br />(Olen Properties Corp. v. City of Newport Beach [2023] 93 Cal.App.5th 270, 280–281). In conformance <br />with this standard, the following analysis is presented in terms of LOS to demonstrate consistency <br />with the Final EIR. A brief VMT analysis is included for informational purposes only. <br />Impacts Identified in the Certified Final EIR <br />The Final EIR determined that implementation of the DSP could conflict with an applicable plan, <br />ordinance, or policy establishing measures of effectiveness of the circulation system, as vehicle <br />traffic generated by the DSP would result in some intersections to operate at an unacceptable LOS <br />standard. Additionally, queue lengths at several intersections were projected to exceed available <br />vehicle storage at several intersections, which would be considered a significant impact. In terms of <br />VMT, which the Final EIR considered for informational purposes only, the VMT per capita of the DSP <br />area would slightly decrease as a result of the DSP due to goals and policies that would encourage <br />alternative modes of transportation. The Final EIR included mitigation measures TRA-1 through TRA- <br />8, which would involve various modifications to area intersections (including but not limited to <br />installing traffic signals, adding travel lanes or turn lanes, or extending turn lanes) to reduce impacts <br />to LOS and vehicle queuing to a less than significant level. The Final EIR concluded that impacts to <br />traffic and transportation would be less than significant with implementation of mitigation <br />measures and the transit support policies of the DSP. <br />The Final EIR determined that the DSP would not conflict with an existing applicable congestion <br />management program, or the Alameda County Transportation Commission’s Congestion <br />Management Plan. Vehicle traffic generated by the DSP would not cause study intersections on <br />routes of regional significance operate below the standard of LOS E. Additionally, the Final EIR
The URL can be used to link to this page
Your browser does not support the video tag.