My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />58 <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to transportation and <br />circulation, and no new or revised mitigation measures are necessary. The project would not include <br />bicycle facilities or conflict with bicycle and pedestrian plans or infrastructure. <br />Conclusion <br />There would be no impact, or impacts would be less than significant and generally reduced <br />compared to the Final EIR, and no significant new or substantially increased transportation impacts <br />would occur compared to those identified in the Final EIR. <br />5.13 Utilities and Service Systems <br />Impacts Identified in the Certified Final EIR <br />The Final EIR determined that development facilitated by the DSP would not violate wastewater <br />treatment requirements of the State Water Resources Control Board (State Water Board) or the San <br />Francisco Regional Water Quality Control Board (RWQCB). Development facilitated by the DSP <br />would be required to comply with existing state and local regulations and policies related to <br />wastewater treatment requirements, and growth facilitated by the DSP is accounted for in the <br />capacity of wastewater treatment facilities. The Final EIR concludes that impacts would be less than <br />significant. <br />The Water Supply Assessment prepared for the DSP determined that Pleasanton’s existing potable <br />water supplies would be sufficient for new demand generated by the DSP. Additionally, the Dublin <br />San Ramon Sanitary District’s Wastewater Treatment Plant was determined to have significant <br />remaining capacity. Therefore, the DSP would not require new or expanded water or wastewater <br />facilities, and impacts would be less than significant. <br />The Final EIR determined that development facilitated by the DSP would not require or result in the <br />construction of new or expanded stormwater facilities, the construction of which could result in <br />significant environmental effects. Development facilitated by the DSP would be required to comply <br />with state, regional, and local requirements to capture, retain, and infiltrate stormwater runoff. The <br />Final EIR concludes that impacts would be less than significant. <br />The Final EIR determined that landfills that serve the DSP area have sufficient permitted capacity to <br />accommodate the DSP’s solid waste disposal needs, and growth facilitated by the DSP would not <br />result in the generation of solid waste that would exceed capacity or federal, state, and local <br />statutes related to solid waste. Impacts would be less than significant. <br />Impacts of the Barone’s Project <br />As described in Section 4.9, Land Use, Population, and Housing, the project would not generate <br />housing units or population growth that would exceed growth anticipated by the DSP and the Final <br />EIR. The project would also include 3,100 square feet of commercial space; the Final EIR anticipated <br />an increase of 260,700 square feet of non-residential space across the Specific Plan area, and the <br />commercial uses included in the proposed project are accounted for in that estimate. Therefore, the <br />proposed project would not generate housing, population, or commercial uses beyond what was <br />evaluated in the Final EIR. The Water Supply Assessment prepared for the Final EIR determined that <br />development facilitated by the DSP would be served by sufficient water supplies. Therefore, the
The URL can be used to link to this page
Your browser does not support the video tag.