Laserfiche WebLink
Environmental Impacts of the Proposed Changes to the Original Project <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 59 <br />proposed project would have adequate water supply and would not require or result in the <br />construction of new or expanded water facilities. Additionally, the project would have sufficient <br />water supplies in normal, dry, and multiple dry years. Impacts would be less than significant. <br />The project site is located in a developed area already served by existing water, wastewater, <br />stormwater, electric power, natural gas, and telecommunication facilities. The proposed project <br />would connect to existing infrastructure. Because the project is accounted for in development <br />anticipated by the Final EIR, the project would not require or result in the construction of new or <br />expanded wastewater, stormwater, electric power, natural gas, and telecommunication facilities. <br />Impacts would be less than significant. <br />The proposed project would generate solid waste during construction and operation. During <br />construction, the current CalGreen code would require that 65 percent of construction and <br />demolition debris be diverted from landfills. Handling of debris and waste generated during <br />construction would be subject to CalGreen requirements, compliance with which would not impair <br />the attainment of solid waste reduction goals. Operation of the project would generate an <br />estimated 33 tons of solid waste per year. This estimation is based on solid waste generation rates <br />provided by the California Department of Recycling and Recovery (CalRecycle), which estimates that <br />residential uses generate 10 pounds of solid waste per dwelling unit per day and that commercial <br />uses generate 13 pounds of solid waste per 1,000 square feet per day (CalRecycle 2021).4 <br />Solid waste from the project site would be collected by Pleasanton Garbage Service and likely sent <br />to the Vasco Road Sanitary Landfill. Table 11 shows the project’s estimated solid waste generation <br />and the remaining capacity of this landfill. <br />Table 11 Generated Solid Waste and Estimated Landfill Capacity <br />Project Solid Waste Generation <br />(tons/day) <br />Permitted Throughput of Vasco <br />(tons/day) <br />Remaining Capacity of Altamont <br />(cubic yards) <br />0.09 2,518 11,560,000 <br />Source: CalRecycle 2019 <br />Project generated waste would be less than 0.01 percent of Vasco Road Landfill’s allowable waste <br />limit, and the landfill has adequate remaining capacity. Therefore, the project’s incremental <br />increase in solid waste would not adversely affect solid waste facilities. Impacts would be less than <br />significant. <br />Overall, the proposed project would have less than significant impacts related to utilities and service <br />systems. <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to utilities and service systems <br />compared with those identified in the Final EIR, and no new mitigation measures are necessary. <br /> <br />4 The project would include 14 residences. 14 residences multiplied by 10 pounds of solid waste per day, multiplied by 365 days per year, <br />equals 51,000 pounds of solid waste per year, or 25.5 tons per year. The project would include 3,100 square feet of commercial use. 13 <br />pounds of solid waste per day, multiplied by 3.1 thousand square feet, multiplied by 365 days per year, equals 14,709 pounds of solid <br />waste per year, or 7.4 tons per year. 25.5 tons plus 7.4 tons is approximately 33 tons of solid waste per year.