My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />475 and 493 St. John Street Mixed-Use Project <br /> <br />60 <br />Conclusion <br />Impacts would be less than significant, similar to the Final EIR, and no significant new or <br />substantially increased utilities and service systems impacts would occur compared to those <br />identified in the Final EIR. <br />5.14 Wildfire <br />Impacts Identified in the Certified Final EIR <br />The Final EIR analyzed impacts related to wildfire in Section 3.7, Hazards and Hazardous Materials. <br />Impacts of the Barone’s Project <br />The project site is within a Local Responsibility Area for fire protection services as designated by CAL <br />FIRE, but is not in or near a state responsibility area or land classified as very high fire hazard <br />severity zone. The nearest VHFHSZ is located 1.8 miles southwest of the project site (CAL FIRE 2020). <br />The project would not require roadway closures and would not introduce a significant number of <br />new vehicles to area roadways. Therefore, the project would not substantially impair an adopted <br />emergency response plan or emergency evacuation plan, and there would be no impact. <br />The project site is generally surrounded by urban development and is not adjacent to undeveloped <br />lands or slopes that would be prone to the uncontrolled spread of a wildfire. The project would not <br />require the installation or maintenance of roads, fuel breaks, emergency water sources, power lines, <br />or other utilities that would exacerbate fire risk. Additionally, the project site is generally flat and <br />surrounded by development and would not expose people or structures to flooding or landslides as <br />a result of post-fire slope instability. <br />Because the project site is not located in or near state responsibility areas or lands classified as <br />VHFHSZs and is in an urbanized area, the project would not result in wildfire impacts. No impact <br />would occur. <br />Effects and Mitigation Measures <br />No new or substantially more severe significant effects would occur to wildfire compared with those <br />identified in the Final EIR, and no new mitigation measures are necessary. <br />Conclusion <br />No significant new or substantially increased wildfire impacts would occur compared to those <br />identified in the Final EIR. <br />5.15 Impacts Not Potentially Significant in the Final EIR <br />The Final EIR considered agriculture and forestry resources and mineral resources in Section 3.14, <br />Impacts not Potentially Significant, of the DSP EIR.
The URL can be used to link to this page
Your browser does not support the video tag.