Laserfiche WebLink
Barone’s project Detailed Report, 10/4/2023 <br />75 / 92 <br />Building Construction Skid Steer Loaders Diesel Tier 3 1.00 8.00 71.0 0.37 <br />Paving Cement and Mortar <br />Mixers <br />Diesel Average 1.00 8.00 10.0 0.56 <br />Paving Pavers Diesel Average 1.00 8.00 81.0 0.42 <br />Paving Paving Equipment Diesel Average 1.00 8.00 89.0 0.36 <br />Paving Concrete/Industrial <br />Saws <br />Diesel Average 1.00 8.00 33.0 0.73 <br />Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48 <br />5.3. Construction Vehicles <br />5.3.1. Unmitigated <br />Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix <br />Demolition ———— <br />Demolition Worker 15.0 11.7 LDA,LDT1,LDT2 <br />Demolition Vendor —8.40 HHDT,MHDT <br />Demolition Hauling 4.00 2.10 HHDT <br />Demolition Onsite truck ——HHDT <br />Site Preparation ———— <br />Site Preparation Worker 27.5 11.7 LDA,LDT1,LDT2 <br />Site Preparation Vendor —8.40 HHDT,MHDT <br />Site Preparation Hauling 0.00 20.0 HHDT <br />Site Preparation Onsite truck ——HHDT <br />Grading ———— <br />Grading Worker 17.5 11.7 LDA,LDT1,LDT2 <br />Grading Vendor —8.40 HHDT,MHDT <br />Grading Hauling 14.2 2.10 HHDT <br />Grading Onsite truck ——HHDT