Laserfiche WebLink
Barone’s project Detailed Report, 10/4/2023 <br />76 / 92 <br />Building Construction ———— <br />Building Construction Worker 6.03 11.7 LDA,LDT1,LDT2 <br />Building Construction Vendor 2.00 8.40 HHDT,MHDT <br />Building Construction Hauling 0.00 20.0 HHDT <br />Building Construction Onsite truck ——HHDT <br />Paving ———— <br />Paving Worker 10.0 11.7 LDA,LDT1,LDT2 <br />Paving Vendor —8.40 HHDT,MHDT <br />Paving Hauling 0.00 20.0 HHDT <br />Paving Onsite truck ——HHDT <br />Architectural Coating ———— <br />Architectural Coating Worker 1.21 11.7 LDA,LDT1,LDT2 <br />Architectural Coating Vendor —8.40 HHDT,MHDT <br />Architectural Coating Hauling 0.00 20.0 HHDT <br />Architectural Coating Onsite truck ——HHDT <br />5.3.2. Mitigated <br />Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix <br />Demolition ———— <br />Demolition Worker 15.0 11.7 LDA,LDT1,LDT2 <br />Demolition Vendor —8.40 HHDT,MHDT <br />Demolition Hauling 4.00 2.10 HHDT <br />Demolition Onsite truck ——HHDT <br />Site Preparation ———— <br />Site Preparation Worker 27.5 11.7 LDA,LDT1,LDT2 <br />Site Preparation Vendor —8.40 HHDT,MHDT <br />Site Preparation Hauling 0.00 20.0 HHDT