My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P21-1173, PUD-146 and Tract 8631: 475 & 493 St. John Street Planning Commission <br />27 of 32 <br />The color schemes generally comprise of light cream earthtone colors, with darker accent <br />colors, with stucco and stone veneer siding for the residential and natural color brick veneer for <br />the commercial buildings. The design guidelines adopted for the Down town stress the use of <br />traditional materials, finishes, colors, and detailing. <br /> <br />The stucco, siding, and painted brick wall materials, garage doors, and porch railings are <br />consistent with the guidelines and are evocative of residential and commercial architecture <br />seen throughout the Downtown, including in both historic buildings and newer construction . <br />Window treatments (sills and trim) meet the guidelines’ suggestions for traditional details in <br />such features. The applicant has provided architectural detailing and accent relief on the <br />building elevations to break up the facades and provide visual relief. The DTDG state detached <br />garages are preferred and should be placed at the rear of the lots. All of the homes would have <br />attached garages which will be well screened from St. John Street . <br /> <br />The house plans and commercial design offer significant detailing and articulation, and the <br />form/shape of the buildings are visually interesting. The materials and colors are attractive and <br />will blend well with the surrounding developments based on similar finish schemes found on <br />other existing residences and commercial buildings in the Downtown. The new residential <br />buildings are two-and-a-half stories in height and the commercial buildings are one-story in <br />height, which offer a transition from the three-story Rose Hotel and is consistent with the <br />existing two-story Barone home and residences on St. John Street. The architectural styles are <br />acceptable styles for Downtown and would be compatible with the eclectic styl e of homes and <br />commercial buildings on St. John Street, Peters Avenue, and found in the Downtown. <br /> <br />Overall, staff supports the architectural design, massing and detailing of the proposed <br />residences and commercial structures. <br /> <br />Affordable Housing and Regional Housing Needs Allocation (RHNA) <br />The City’s Inclusionary Zoning Ordinance (IZO) requires new single-family residential projects <br />of fifteen units or more to provide at least 20% of units at prices affordable to very low -, low-, <br />and/or moderate-income households. The proposed project includes retaining the home and <br />constructing 14 single-family homes, which is below the threshold project size to require <br />on-site affordable units to be provided. The project would be subject to payment of the City’s <br />Affordable Housing in-lieu fee, pursuant to PMC Chapter 17.40. <br /> <br />Grading and Drainage <br />Site drainage will be directed towards landscaped bio-retention planters located in various <br />areas of the subject site for retention and treatment before draining into the City’s storm drain <br />system. The DSP area is already largely built out, and the Downtown Specific Plan Final EIR <br />determined development facilitated by the DSP would not substantially alter the drainage <br />pattern of the DSP area, including through the alteration of a stream or river. The proposed <br />project would be required to develop and implement a Storm Water Pollution Prevention Plan <br />(SWPPP) with erosion, stormwater control, and sediment control BMPs as required by the <br />Construction General Permit to manage erosion, siltation, and flooding impacts during <br />construction, in operation. As proposed, the project would not result in substantial alterations to <br />the existing drainage pattern of the DSP area and would not result in substantial erosion, <br />siltation, or flooding. As conditioned, staff finds the proposed grading and drainage plan to be <br />acceptable and in compliance with applicable stormwater runoff requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.