Laserfiche WebLink
Page 2 of 3 <br />Request for Proposals (RFP) for consulting services to perform test well construction <br />oversight, water quality and yield testing, an assessment of groundwater sustainability, a <br />feasibility review of alternative project configurations, and a basis of design for the <br />recommended alternative. Zone 7 received five proposals and, after interviews were <br />conducted by a committee consisting of Zone 7 and City staff, Luhdorff & Scalmanini <br />Consulting Engineers (LSCE) was selected as the most qualified for this project, with a final <br />and best contract amount for the Phase 1 project of $1,083,836. As noted, City staff <br />participated in the contract solicitation and selection processes which align with the City’s <br />procurement process. <br /> <br />On October 16, 2024, the Zone 7 Board of Directors authorized its General Manager to enter <br />into agreement with Nor-Cal Pump & Well Drilling, Inc. for a not-to-exceed limit of $1,540,958 <br />which includes a 10 percent contingency. Also on October 16, 2024, the Zone 7 Board <br />authorized its General Manager to enter into agreement with LSCE for a not-to-exceed limit of <br />$1,192,220 which includes a 10 percent contingency. This agreement includes approximately <br />$175,000 of optional services that are specific to Zone 7 regional efforts and, if performed, will <br />not be part of the cost share with the City. The Zone 7 agenda report is provided as <br />Attachment 2. <br /> <br />When combined, anticipated services for the contractor test well construction agreement, the <br />consultant feasibility study agreement, and other minor services are $2,733,178, which <br />exceeds the not-to-exceed limit of the original City and Zone 7 agreement of $2,000,000. <br />Therefore, staff recommends the City approve Amendment No. 1 (Attachment 1) to the original <br />agreement with Zone 7 to increase the total not-to-exceed limit by $733,178 to a revised not- <br />to-exceed limit of $2,733,178 with cost sharing of $1,449,947 for Zone 7 and $1,283,231 for <br />the City. <br /> <br />Other terms and conditions in the original agreement are unchanged. <br /> <br />EQUITY AND SUSTAINABILITY <br />Approval of this action advances the Citywide Climate Action Plan 2.0 (CAP) - Water <br />Resources - Reduce GHG emissions from water usage (including conveyance) and prepare <br />community water resources for a changing climate which will result in cost savings, enhance <br />water quality and availability, improve infrastructure, and increase resiliency. <br /> <br />OUTREACH <br />Phase I of the project include community engagement efforts led by the City, including <br />notifications of test well construction activities and outreach to understand and mitigate <br />potential impacts. A November 1 community meeting held in the Pleasanton Tennis and <br />Community Park was promoted to neighborhoods near the three identified parks and shared <br />more broadly on the City's social media platforms. <br /> <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this action advances the ONE Pleasanton strategic goal of Investing in Our <br />Environment - Strategy 3 to identify funding and implement the recommendations from the <br />Water Supply Alternative Study to resolve PFAS water quality issues. <br /> <br /> <br />Page 165 of 658